Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Civil and Environmental Engineering

Theses/Dissertations

Compensation

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Real-Time Atmospheric Compensation And Surface Temperature Estimates From Satellite Using Neural Networks, Gary Bouton Jan 2013

Real-Time Atmospheric Compensation And Surface Temperature Estimates From Satellite Using Neural Networks, Gary Bouton

Dissertations and Theses

Military satellites are being used to determine potential security threats using accurate high sensitivity measurements from defense satellites. These systems focus much more on sensitivity and Signal/Noise Ratio (SNR) than on multispectral capability. Therefore, these systems are highly vulnerable to thermal absorption and reemission that can affect the thermal signature prior to launch. In particular, there is a need to use additional assets to estimate the atmospheric temperature and water vapor profile so that an estimate of the atmospheric processes can be obtained and a correction developed to improve the thermal detection. In particular, the use of existing meteorological geostationary …


The Application Of Nepa Requirements To Cercla Remedial Actions, Connie L. Strobbe Jun 1994

The Application Of Nepa Requirements To Cercla Remedial Actions, Connie L. Strobbe

Theses and Dissertations

This study investigated the application of National Environmental Policy Act NEPA requirements to Comprehensive Environmental Response, Compensation, and Liability Act CERCLA actions. Similarities in the documentation and public participation requirements of NEPA and CERCLA include identification and evaluation of alternatives and public participation. Differences include document contents and timing of public participation. This study presented four options for ensuring NEPA compliance at CERCLA sites. Option one included a Programmatic Environmental Impact Statement PEIS with subsequent combined FSEIS report for each subunit. Option two eliminated the PEIS, but retained a stand-alone NEPA document for each CERCLA subunit. Option three included a …