Articles 1 - 5 of 5

Full-Text Articles in Engineering

Development Of Pre-Stressed Cfrp Fatigue Retrofits For Common Steel Bridge Connections, Korey Albert Pough Dec 2015

Development Of Pre-Stressed Cfrp Fatigue Retrofits For Common Steel Bridge Connections, Korey Albert Pough

Graduate Theses and Dissertations

Aging or deterioration of the nation’s bridge infrastructure is a significant issue that requires attention. Causes for much of this deterioration can be attributed to two main factors, 1) corrosion, and 2) metallic fatigue, both of which work together to reduce the strength and serviceability of bridge components over time. In many instances, strengthening of bridge components using localized retrofits offers an economical and fast solution for increasing the longevity of existing steel bridges; however, such retrofits must be resilient to further corrosion and fatigue damage. In this study, a localized retrofit is developed using pre-stressed Carbon Fiber Reinforced Polymer …


Proportioning And Properties Of Ultra-High Performance Concrete Mixtures For Application In Shear Keys Of Precast Concrete Bridges, Zhengqi Li Dec 2015

Proportioning And Properties Of Ultra-High Performance Concrete Mixtures For Application In Shear Keys Of Precast Concrete Bridges, Zhengqi Li

All Dissertations

Ultra-high performance concrete (UHPC) is defined as a cementitious based composite material with compressive strengths above 150 MPa, pre-and post-cracking tensile strengths above 5 MPa, and enhanced durability. To achieve desired properties, UHPC is typically produced with low water-cementitious materials (w/cm) ratio (i.e. w/cm < 0.25), high cementitious materials content (i.e. >1000 kg/m3), high quality aggregate, high dosage of high-range water reducing admixture (HRWRA) and reinforcing fibers. UHPC has distinct advantages in applications where narrow formwork and dense reinforcement are inevitable, high compressive strength concrete material is required and the surrounding environment is aggressive. The construction of shear keys in precast bridges is one of the important …


Reliability Of Bridge Superstructures In Wisconsin, Azam Nabizadehdarabi Aug 2015

Reliability Of Bridge Superstructures In Wisconsin, Azam Nabizadehdarabi

Theses and Dissertations

ABSTRACT

RELIABILITY OF BRIDGE SUPERSTRUCTURES IN WISCONSIN

by

Azam Nabizadehdarabi

The University of Wisconsin-Milwaukee, 2015

Under the Supervision of Professor Habib Tabatabai

Bridge reliability analyses form the basis of modern bridge design provisions. Such analyses are also used to evaluate bridge condition and assess future maintenance needs. The majority of these reliability assessments are based on evaluating risks associated with the various load effects exceeding their corresponding resistance. However, bridge components such as decks and superstructures typically do not reach the end of their service lives by exceeding the strength limit states (structural failure). Survival analyses, which are commonly used …


Right Hand Fork Pedestrian Bridge Final Report, Ren Gibbons May 2015

Right Hand Fork Pedestrian Bridge Final Report, Ren Gibbons

Undergraduate Honors Capstone Projects

Right Hand Fork is a tributary canyon whose stream enters the Logan River nine miles east of the mouth of Logan Canyon near Logan, Utah. The access bridge to a popular recreational area, the Hobbit Caves, was damaged in 2011 by flooding. We propose that a new bridge be designed and constructed for the Forest Service to replace the current structure to ensure public safety and minimize environmental impact. We plan to use a longer bridge span that will situate the abutments higher on the stream bank and reduce possible water damage during flood events. Bridge costs will be minimized …


State Of Accelerated Bridge Construction (Abc) In The United States, Mike Ofili Apr 2015

State Of Accelerated Bridge Construction (Abc) In The United States, Mike Ofili

Honors College Theses

The purpose of this project is to develop a toolkit for the design and construction of bridges using prefabricated materials primarily to reduce the closure time and on-site construction time of newly constructed bridges or bridges undergoing renovation. The research focuses specifically on short span bridges in Georgia (40,60,80, and 120ft spans).

Areas of primary concern for this project were design, constructability, structural analysis, the use of concrete and steel girders, cost efficiency, and industry surveys. In this particular portion of the study, the surveys proved to be most effective when combined with information obtained existing research as well as …