Full-Text Articles in Engineering

Behavior Of Prestressed Concrete Bridges With Closure Pour Connections And Diaphragms, Gercelino Ramos Oct 2019

Behavior Of Prestressed Concrete Bridges With Closure Pour Connections And Diaphragms, Gercelino Ramos

Masters Theses

Accelerated Bridge Construction (ABC) has gained substantial popularity in new bridge construction and bridge deck replacement because it offers innovative construction techniques that result in time and cost savings when compared to traditional bridge construction practice. One technology commonly implemented in ABC to effectively execute its projects is the use of prefabricated bridge components (precast/prestressed bridge components). Precast/prestressed bridge components are fabricated offsite or near the site and then connected on-site using small volume closure pour connections. Diaphragms are also commonly used to strengthen the connection between certain prefabricated components used in ABC, such as beam elements. Bridges containing closure …


Development Of High Early-Strength Concrete For Accelerated Bridge Construction Closure Pour Connections, Stephanie Castine Jul 2017

Development Of High Early-Strength Concrete For Accelerated Bridge Construction Closure Pour Connections, Stephanie Castine

Masters Theses

Accelerated bridge construction (ABC) has become a popular alternative to using traditional construction techniques in new bridge construction and existing bridge deck replacement because of the reduction of time spent in field activities. A key feature of bridges built using ABC techniques is the extensive use of prefabricated components. Prefabricated components are joined in the field using small volume closure pours involving high performance materials (steel and concrete) to ensure adequate transfer of forces between components. To date, the materials developed for closure pours have been based on proprietary components, so a need has arisen for development of mixes that …


Developing Standard Procedures For Structural Aspects Of Slide-In Bridges In Accelerated Bridge Construction (Abc), Ozan Utku Ridvanoglu Apr 2016

Developing Standard Procedures For Structural Aspects Of Slide-In Bridges In Accelerated Bridge Construction (Abc), Ozan Utku Ridvanoglu

Masters Theses

Slide-in bridge construction (SIBC) is a special method especially used to replace an existing bridge with the minimum duration road closure. In this method, new bridge superstructure is built next to the existing one and it is slid to its final position after demolishing the existing one. Applied implementations of SIBC show that several complications are experienced during bridge slide related with surface interaction. There is a need to evaluate the structural components of SIBC to develop suggestions. In this research, structural components of SIBC were investigated. The research dealt with completed SIBC implementations and numerical modelling of the slide …