Earthquake engineering

Publication Year

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Cascadia Subduction Zone Earthquake Vertical Ground Acceleration Investigation And Potential Impact On Bridges In The Pacific Northwest, Rachel Caroline Bassil Oct 2022

Cascadia Subduction Zone Earthquake Vertical Ground Acceleration Investigation And Potential Impact On Bridges In The Pacific Northwest, Rachel Caroline Bassil

Civil and Environmental Engineering Master's Project Reports

The effects of vertical ground accelerations during subduction zone earthquakes currently are not sufficiently understood. There are numerous case studies and evidence that effects of vertical ground accelerations can significantly impact the performance of bridges during a seismic event, but most previous research has been focused on shallow crustal earthquakes. Current bridge design codes provide little guidance for accounting for vertical ground accelerations in seismic design, in part because additional information is needed about the characteristics of vertical ground motions during Cascadia Subduction Zone (CSZ) earthquakes in the Pacific Northwest.

For this study, recorded seismic data from recent subduction zone …


Rapid Repair Of Seismically Vulnerable Bridge Columns Following Earthquake Induced Damage, Gregory H. Norton Oct 2020

Rapid Repair Of Seismically Vulnerable Bridge Columns Following Earthquake Induced Damage, Gregory H. Norton

Civil and Environmental Engineering Master's Project Reports

The Cascadia Subduction Zone (CSZ) earthquake has a high probability of occurrence within our lifetime, threatening bridges across the Pacific Northwest. Damage is expected to be geographically spread throughout the region and will have a nearly simultaneous impact on transportation through several important corridors. While bridge repair and replacement will ultimately be needed, priority will be placed on resuming mobility such that repairs will need to be implemented quickly. In an effort to anticipate this need, a repair method is being developed for rapid repair with the goal of achieving semi-permanent installation that also considers the different bridge damage states …