Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Civil and Environmental Engineering

University of Tennessee, Knoxville

Journal

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Streambank Erosion Mapping On The Nottoway River Using Gps-Based Above-Water Video, Emine Fidan Jun 2017

Streambank Erosion Mapping On The Nottoway River Using Gps-Based Above-Water Video, Emine Fidan

Pursuit - The Journal of Undergraduate Research at The University of Tennessee

This project concerns the development of streambank erosion maps on military installations utilizing GPS-based above-water video mapping and image georeferencing techniques. The river mapped was the Nottoway River at the Fort Pickett military installation on October 10-11, 2015. Kayak-mounted above-water cameras were utilized to capture georeferenced images of streambank erosion. These GIS-based erosion classifications were utilized to develop erosion maps for determining streambank erosion conditions along the river. Areas of high erosion were identified as about two percent of the river (2167 ft. of streambank length). These maps allow for the opportunity to revisit the sites to determine changes in …


Bringing To Life The World’S Tallest Structure, Jonathan Weigand Mar 2013

Bringing To Life The World’S Tallest Structure, Jonathan Weigand

Pursuit - The Journal of Undergraduate Research at The University of Tennessee

Intended as the centerpiece of constructional developments in Dubai, the Burj Khalifa now stands as the tallest building ever constructed. The uniquely designed foundation consists of a concrete raft supported by a cast-in-place pile system protected by waterproofing membrane to inhibit corrosion. The structural design integrates high-performance reinforced concrete and steel and incorporates an engineered “Y” shape that limits the lateral wind pressure on the building. Engineers applied the latest advancements in high-rise technology to develop an optimized construction plan that consisted of segmented tasks that promoted the staff to work at a quick yet manageable pace. This article details …