Nebraska Department of Transportation: Research Reports

2019

Barrier system

Articles 1 - 1 of 1

Full-Text Articles in Engineering

34-Inch Tall Three Beam Transition To Concrete Buttress, Scott Rosenbaugh, Wyatt Fallet, Ronald K. Faller, Robert W. Bielenberg, Jennifer Schmidt Mar 2019

34-Inch Tall Three Beam Transition To Concrete Buttress, Scott Rosenbaugh, Wyatt Fallet, Ronald K. Faller, Robert W. Bielenberg, Jennifer Schmidt

Nebraska Department of Transportation: Research Reports

Roadway resurfacing and overlay projects effectively reduce the height of roadside barriers placed adjacent to the roadway, which can negatively affect their crashworthiness. More recently, bridge rails and concrete barriers have been installed with slightly increased heights to account for future overlays. However, adjacent guardrails and approach transitions have not yet been modified to account for overlays. The objective of this project was to develop an increased-height, approach guardrail transition (AGT) to be crashworthy both before and after roadway overlays of up to 3 in. (76 mm).

A 34-in. (864-mm) tall, thrie beam transition was designed such that the system …