Energy Dissipation Optimization For Circular Culverts, Chi Zhang Aug 2023

Energy Dissipation Optimization For Circular Culverts, Chi Zhang

Department of Civil and Environmental Engineering: Dissertations, Theses, and Student Research

The principal goal of the current research is to develop and improve weir-based energy dissipator designs at the outlets of circular culverts. In the present case, we are interested in full-length weirs and staggered weirs. A review of related literature was completed and reported; a test facility was carefully designed and constructed to collect flow information in a basin downstream of a model broken-back circular culvert; instrumentation was installed to measure discharges, streamwise depths, and velocities. Both full-length and staggered weirs were tested over a range of discharges and tailwaters. The two types of weirs were subjected to two types …


Boy Scouts Of America Concept Site Master Plan And Improvements, Anna Cole, Jacob Chekal, William Seeger, Shanon Al-Brady, Nicholas Cowles May 2019

Boy Scouts Of America Concept Site Master Plan And Improvements, Anna Cole, Jacob Chekal, William Seeger, Shanon Al-Brady, Nicholas Cowles

Honors Theses

Our team, G1 Engineering, has partnered with the Boy Scouts of America to provide an update to their master plan for the Outdoor Education Center site located at 600 S. 120th Street, Lincoln, NE. Our work included providing transportation solutions; drainage evaluations; investigation of geotechnical conditions; environmental evaluation and determination of permitting requirements; preparation of concept design plans for bridges, drainage, utilities, and overall site plan; and evaluation of structural elements included in the project.

Two streams cross the property presenting site access issues. Our team provided pedestrian, UTV, and emergency vehicle access bridges to address these issues. With …


Outdoor Education Center Concept Site Master Plan And Improvements As Designed By Wingineers, Christina Thibodeau May 2019

Outdoor Education Center Concept Site Master Plan And Improvements As Designed By Wingineers, Christina Thibodeau

Honors Theses

This thesis builds on a basis of four years of engineering education to produce a final project for the capstone course. The idea behind this project was to provide a workable master plan and conceptual site improvements for a real application, the Outdoor Education Center in east Lincoln, Nebraska. The Boy Scouts of America Cornhusker Council and the University of Nebraska – Lincoln Department of Civil Engineering have cooperated throughout the Senior Design capstone course to make this possible for the students involved.


Structural Identification And Assessment Of The Inverted Tee Girder Bridge System, Garrett P. Martindale Apr 2018

Structural Identification And Assessment Of The Inverted Tee Girder Bridge System, Garrett P. Martindale

Department of Civil and Environmental Engineering: Dissertations, Theses, and Student Research

The Inverted Tee (IT) girder bridge system was originally developed in 1996 by the University of Nebraska–Lincoln (UNL) and Nebraska Department of Roads (NDOR) engineers. This bridge system currently accounts for over 110 bridges in Nebraska used for both state highways and local county roads. Excessive transverse and longitudinal deck cracking has been observed and noted in numerous bridge inspection reports. Since the IT girder bridge system is relatively new, limited data and knowledge exist on its structural performance and behavior. This study evaluates the IT girder bridge system by conducting twenty field observations as well as recording accelerometer time …