Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Chemical Engineering

The University of Akron

Safety

Articles 1 - 1 of 1

Full-Text Articles in Engineering

Process Control Laboratory Skid Refurbishment, Danny Crowder Jan 2017

Process Control Laboratory Skid Refurbishment, Danny Crowder

Williams Honors College, Honors Research Projects

This project evaluates a salvaged process control skid for potential refurbishment and educational re-use. In-lab work evaluated the existing skid. Several process control elements have been recommended for replacement, including the process tank (due to corrosion), the pressure transmitter (operability/corrosion), the flow meters (mechanical) and the control system (age). The control valves, temperature elements and transmitters, pump, holding tanks, and the electrical heat exchanger should be salvaged. An I/P converter and pressure relief valve should be added to the pneumatic feed. Enclosing of all electrical components should be prioritized. An electrical schematic for a new control system should be implemented. …