Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 2 of 2
Full-Text Articles in Engineering
Unexpected Setbacks When Excavating – Using Gpr For Mitigating Risk: A Case Study, Samuel L. Marcum
Unexpected Setbacks When Excavating – Using Gpr For Mitigating Risk: A Case Study, Samuel L. Marcum
Construction Management
Whether constructing on undeveloped land or on an existing developed site, there is a risk of encountering unexpected objects when excavating. With today’s technology in Ground Penetrating Radar (GPR), this risk can generally be mitigated. Using Whiting-Turner’s construction of Stanford University’s new ChEM-H & SNI Building as an example, this case study discusses the use of GPR for underground mapping, as well as various ways to implement GPR technology. The ChEM-H & SNI site had many underground utilities that required precise pot-holing to verify locations. Although pot-holing is widely used, it is a destructive method, it is time and labor …
Building Information Modeling (Bim) Impact On Construction Performance, David D. John
Building Information Modeling (Bim) Impact On Construction Performance, David D. John
Electronic Theses and Dissertations
This study is designed to address the need for having a measure for Construction Performance on BIM-assisted construction projects. Through this study a new Construction Key Performance Indicator (CKPI) matrix is identified and created by the author. The CKPI could be used to assess BIM-assisted projects. Utilizing a sequential mixed methodology approach, academic and practitioner perspectives are assessed. A qualitative content analysis and quantitative descriptive analysis based on demographics are conducted to establish a better understanding of BIM and Construction Performance. The academic perspective is used to assess the relevance of BIMM and CKPI indicators, and the practitioner perspective is …