Open Access. Powered by Scholars. Published by Universities.®

Business Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 8 of 8

Full-Text Articles in Business

Methods To Support The Project Selection Problem With Non-Linear Portfolio Objectives, Time Sensitive Objectives, Time Sensitive Resource Constraints, And Modeling Inadequacies, Neil C. Ranly Sep 2018

Methods To Support The Project Selection Problem With Non-Linear Portfolio Objectives, Time Sensitive Objectives, Time Sensitive Resource Constraints, And Modeling Inadequacies, Neil C. Ranly

Theses and Dissertations

The United States Air Force relies upon information production activities to gain insight regarding uncertainties affecting important system configuration and in-mission task execution decisions. Constrained resources that prevent the fulfillment of every information production request, multiple information requestors holding different temporal-sensitive objectives, non-constant marginal value preferences, and information-product aging factors that affect the value-of-information complicate the management of these activities. This dissertation reviews project selection research related to these issues and presents novel methods to address these complications. Quantitative experimentation results demonstrate these methods’ significance.


Scheduling Strategies For Construction Project Managers Toward On Time Delivery, Paul Shamp Jan 2017

Scheduling Strategies For Construction Project Managers Toward On Time Delivery, Paul Shamp

Walden Dissertations and Doctoral Studies

Construction management projects involve complex, dynamic environments resulting in uncertainty and risk, compounded by demanding time constraints. Research indicated project managers have struggled to identify best practices for scheduling construction projects via critical path methodologies while searching for tools to increase timely job completions and budget profits. The purpose of this single case study was to explore the strategies that construction project managers used to manage scheduled construction project delivery on time. The constructivist philosophical worldview was used as the framework for this study. Data were collected from semistructured interviews from 7 project managers from 5 different construction companies selected …


Vehicle Minimization For The Multimodal Pickup And Delivery Problem With Time Windows, Benjamin A . Clapp Mar 2013

Vehicle Minimization For The Multimodal Pickup And Delivery Problem With Time Windows, Benjamin A . Clapp

Theses and Dissertations

The algorithm proposed here is used for heuristic solutions for the Multimodal Multiple Vehicle Routing Problem with Unloading Capacity, Pickup and Dropoff, and Time Windows, solved so as to minimize the number of vehicles used, subject to varying objective function values for each vehicle. The MVRP is simplified and split into a routing problem and a scheduling problem. The routing problem is addressed by Dijkstra's Algorithm. This generates a new network for the second stage of the algorithm. It is assumed that the shortest path is the correct path to use, and shipments each travel unimodally. The scheduling problem is …


Comparing F-16 Maintenance Scheduling Philosophies, Konstantinos Iakovidis Jun 2005

Comparing F-16 Maintenance Scheduling Philosophies, Konstantinos Iakovidis

Theses and Dissertations

In the F-16 fighter community it is believed that the flying schedule can make or break a wing's maintenance effort. Nevertheless, there is no published scientific support behind many commonly used maintenance scheduling philosophies. The problem is that a generally accepted overall scheduling philosophy to improve the long term health of the fleet does not exist. The purpose of this research is tri-fold: to identify the most important scheduling philosophies, to identify the most meaningful metrics that capture the long term health of the fleet and maintenance effectiveness, and to compare the various philosophies using the performance measures to help …


Optimization Model For Base-Level Delivery Routes And Crew Scheduling, Young-Ho Cha Mar 2005

Optimization Model For Base-Level Delivery Routes And Crew Scheduling, Young-Ho Cha

Theses and Dissertations

In the U.S. Air Force, a Logistic Readiness Squadron (LRS) provides material management, distribution, and oversight of contingency operations. Dispatchers in the LRS must quickly prepare schedules that meet the needs of their customers while dealing with real-world constraints, such as time windows, delivery priorities, and intermittent recurring missions. Currently, LRS vehicle operation elements are faced with a shortage of manpower and lack an efficient scheduling algorithm and tool. The purpose of this research is to enhance the dispatchers' capability to handle flexible situations and produce "good" schedules within current manpower restrictions. In this research, a new scheduling model and …


Effects Of Shiftwork On Air Force Aircraft Maintenance Personnel, Craig A. Campbell Sep 1998

Effects Of Shiftwork On Air Force Aircraft Maintenance Personnel, Craig A. Campbell

Theses and Dissertations

This study examined the effects of converting a large aircraft maintenance squadron from 8-hour shifts to 12-hour shifts. The squadron studied converted its 24- hour maintenance work force from three 8-hour work shifts to two 12-hour work shifts incrementally, with one section converting to 12-hour shifts in January, 1996, and the remaining section converting in July, 1996. Both sections remained on 12-hour shifts until September, 1997, when both sections converted back to a three shift 8-hour operation. Health and well being, on- and off-duty accident rates, day shift vs. night shift accident rates, and the effects of stress and fatigue …


The Scheduling Process In A Depot From The Brazilian Air Force, Fabricio J. Saito Jun 1998

The Scheduling Process In A Depot From The Brazilian Air Force, Fabricio J. Saito

Theses and Dissertations

The Brazilian Air Force (BAF) in its logistic structure contains 5 Air Logistic Centers (depots). This thesis concentrates its analysis on one of the most important BAF depots located at Sao Paulo (PAMASP). This thesis explores the scheduling process currently used in PAMASP. This thesis adopted a managerial approach in a sense that it looked to take a big picture of the current process. The researcher performed field interviews with the goal of describing the process. During the visit to PAMASP, the researcher also gathered problems related to the process. The recommendations stated on this study were based on the …


Crisis Airlift Management: Effective Scheduling, David C. Penny Sep 1996

Crisis Airlift Management: Effective Scheduling, David C. Penny

Theses and Dissertations

This is a report on the basis, data, findings, and models developed for US Transportation Command and Headquarters Air Mobility Command. Focusing on the dynamic scheduling problem that arises during management of airlift assets into space-constrained airfields during a crisis, this research explains the conditions surrounding this event, discusses several areas of potential cross-functional applications, presents analysis of current performance, and provides several modeling possibilities for schedule efficiency. Past research in the Flow Management Problem (an airline flow control issue) is extensive, but specific applications in crisis airlift are long in coming, primarily due to the complexity of the environment. …