Open Access. Powered by Scholars. Published by Universities.®

Business Commons

Open Access. Powered by Scholars. Published by Universities.®

Theses/Dissertations

Engineering

2014

Social sciences

Articles 1 - 3 of 3

Full-Text Articles in Business

A Lean Logistics Assessment Tool For Smes In The Manufacturing Sector, Diana Lorena Sanchez Ramirez Apr 2014

A Lean Logistics Assessment Tool For Smes In The Manufacturing Sector, Diana Lorena Sanchez Ramirez

Open Access Theses

This study developed an assessment tool to rate the maturity of the current and desired states of lean logistics operations in small and medium enterprises. The tool consists of 48 best practices classified into 8 critical factors: Inventory, Transportation, Administration, Information Systems, Warehouse, Forecasting, Packaging and Supplier Network. Each of the best practices and critical factors were identified throughout a thorough literature review and comparative analysis between authors to define commonalities among them. Using gap analysis; this tool results in a SWOT matrix providing a roadmap for lean implementation. The resulting model was evaluated by subject matter experts in different …


Guidelines For Construction Companies To Decide Between Outsourcing And Self-Performing For Prefabricated Components, Sebastian Soto Ortiz Apr 2014

Guidelines For Construction Companies To Decide Between Outsourcing And Self-Performing For Prefabricated Components, Sebastian Soto Ortiz

Open Access Theses

Prefabrication and modularization has been used in the construction industry for decades. It has recently made a resurgence worldwide providing increased productivity, safety, quality and construction schedule. This research has focused on the situation where a construction company has decided to use prefabrication and faces two possibilities, they either will self-perform or they will outsource the construction of the prefabricated components. The decision making process used by a construction company to determine whether to outsource or self-perform prefabricated components is examined and analyzed.

Prefabrication is an industrial process in which certain components are manufactured in a specialized facility. These items …


An Analysis On Causes Of Late Final Payment And Release Of Retainage: Electrical Subcontractors’ View, Xuejing Zhang Apr 2014

An Analysis On Causes Of Late Final Payment And Release Of Retainage: Electrical Subcontractors’ View, Xuejing Zhang

Open Access Theses

Using the survey approach, this study identified the underlying causes of late payments and release of retainage for electrical subcontractors, attempting to answer the questions, "What were the minimum, maximum and average delay days of final payment and release of retainage?", "What were the rank of factors in terms of significance on delaying final payment and release of retainage?", and "What were the rank of factors in terms of frequency on delaying final payment and release of retainage?" A survey questionnaire was developed and distributed to about 150 professionals in electrical subcontractors. 29 reports were collected. Based upon the analysis …