Determining The Optimal Work Breakdown Structure For Government Acquisition Contracts, Brian J. Fitzpatrick
Determining The Optimal Work Breakdown Structure For Government Acquisition Contracts, Brian J. Fitzpatrick
Theses and Dissertations
The optimal level of Government Contract Work Breakdown Structure (G-CWBS) reporting for the purposes of Earned Value Management was inspected. The G-Score Metric was proposed, which can quantitatively grade a G-CWBS, based on a new method of calculating an Estimate At Completion (EAC) cost for each reported element. A random program generator created in R replicated the characteristics of DOD program artifacts retrieved from the Cost Analysis Data Enterprise (CADE) system. The generated artifacts were validated as a population, however validation at the demographic combination level using an artificial neural network was inconclusive. Comparative WBS forms were created for a …
Modeling And Simulation Of Evacuation Plan For Hancock Stadium, Nirmal Neranjan Weerasekara
Modeling And Simulation Of Evacuation Plan For Hancock Stadium, Nirmal Neranjan Weerasekara
Theses and Dissertations
The goal of this study is to use Modeling and Simulation of Evacuation Plan (MSEP) to support management to execute proper evacuation plan in case of emergency at Hancock Stadium in Illinois State University. Analyses of the research literature and evacuation scenarios are used to build a simulation system that will connect a description of emergency and evacuation situation with its context. It shows how an evacuation plan actually functions. The results of the study will help safety managers to understand the current situations of evacuation according to the specific simulation scenarios. The evacuation simulation is categorized according to the …