Open Access. Powered by Scholars. Published by Universities.®

Business Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 3 of 3

Full-Text Articles in Business

Dynetics' Contracts System Requirements Project, Lindsay Black May 2001

Dynetics' Contracts System Requirements Project, Lindsay Black

Honors Capstone Projects and Theses

No abstract provided.


Forecasting Readiness: Using Regression To Predict The Mission Capability Of Air Force F-16 Fighter Aircraft, Steven A. Oliver Mar 2001

Forecasting Readiness: Using Regression To Predict The Mission Capability Of Air Force F-16 Fighter Aircraft, Steven A. Oliver

Theses and Dissertations

According to many, the readiness of America's forces deteriorated in the 1990s. In the Air Force, the combat readiness of its fighter aircraft has declined. One of its indicators of combat readiness, the mission capable rate, is used to identify the percentage of aircraft unable to perform their missions. From FY94-FY98, the aggregate total not mission capable rate for maintenance steadily increased from 14% to 18.2% while total not mission capable rate for supply increased from 5.5% to 17.5% between FY86 and FY00. The USAF uses the funding/Availability Multi-Method Allocator for Spares model to forecast these rates for its aircraft. …


Analysis Of The Next Generation Small Loader (Ngsl) In Reducing The Mobility Footprint, Victor A. Anaya Mar 2001

Analysis Of The Next Generation Small Loader (Ngsl) In Reducing The Mobility Footprint, Victor A. Anaya

Theses and Dissertations

The impact the Next Generation Small Loader (NGSL) will have on reducing the mobility footprint has not been thoroughly explored. The global mobility system cannot function without adequate Materiel Handling Equipment (MHE). MHE of the future must be multi-purpose in design and should able to support multiple weapon systems. In addition, it will require less maintenance and be easier to deploy thus making air mobility operations more responsive to customer needs. Current MHE is old and labor intensive. The Air Mobility Command's (AMC's) small loaders, especially 25K loaders, are in very poor condition and are incapable of servicing KC-1Os and …