Open Access. Powered by Scholars. Published by Universities.®

Business Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 5 of 5

Full-Text Articles in Business

An Investigation Into Aircraft Availability, Michael S. Kapitzke Sep 1995

An Investigation Into Aircraft Availability, Michael S. Kapitzke

Theses and Dissertations

The Air Force currently uses an expected value model in the Aircraft Availability Model (AAM) to calculate aircraft availability. However, even with the application of Lean Logistics, the failure-demand rate and the depot repair time are not fixed and the mean value is still used in the model. This research looks at the effect of the magnitude of the variance of the distributions of failure-demand rate and depot repair time. Also, this research evaluates the effect of variable mean failure-demand rates on the variability of aircraft availability. A simulation model was developed which applied the variable failure-demand rates and depot …


A Study Of The Structural Limitation Affecting Implementation Of The Government Performance And Results Act In Air Force Materiel Command Logistics, Darwina M. Liguori Sep 1995

A Study Of The Structural Limitation Affecting Implementation Of The Government Performance And Results Act In Air Force Materiel Command Logistics, Darwina M. Liguori

Theses and Dissertations

This thesis provides an in-depth discussion of the Government Performance and Results Act (GPRA) of 1993. The GPRA is a new law that mandates strategic management be conducted in all federal government agencies. Soon all federal government agencies will be directed to comply with the requirements of the law and implement strategic management within their organizations. This study selected Air Force Materiel Command Headquarters (AFMC) logistics organizations and subordinate units as the test organization. Interviews were conducted with headquarters AFMC logistics and strategic planning personnel, as well as 88th Logistics Group personnel to evaluate several issues within their organization: (1) …


Aligning Demand For Spare Parts With Their Underlying Failure Mode, Steven D. Kephart, Richard C. Roberts Sep 1995

Aligning Demand For Spare Parts With Their Underlying Failure Mode, Steven D. Kephart, Richard C. Roberts

Theses and Dissertations

Current Air Force demand forecasting systems, DO41 and REALM, assume reparable demand is solely flying hour driven. The purpose of this study is to evaluate the relationship between demands, flying hours, and number of sorties at the work unit code level and improve reparable demand forecasting. A three phase methodology is used to analyze the demand, flying hour, and sortie relationship. The first phase uses multiple regression to determine a relationship at various work unit code levels. Multiple regression provides limited correlation between demands, flying hours, and sorties. The second phase uses Poisson regression to evaluate the integer, count nature …


A Performance Analysis Of The Air Force War Time Lean Logistics Pipeline, Craig S. Gaddis, David A. Haase Sep 1995

A Performance Analysis Of The Air Force War Time Lean Logistics Pipeline, Craig S. Gaddis, David A. Haase

Theses and Dissertations

Lean Logistics is an innovative proposal designed to reduce the costs associated with reparable inventory management. The purpose of this thesis is to determine whether a wartime lean logistics pipeline can maintain acceptable aircraft availability rates in response to induced variations of order and ship time (OST) and flying hours for deployed forces. The Dyna-MEIRIC Version 6.4 simulation program was used to evaluate nine different factor-level combinations. The factors, OST and flying hours were varied at three different levels, low, medium, and high. Analysis of the results was accomplished using a two-factor ANOVA. The authors discovered that while increasing OST …


The Effect Of Consolidating Two-Level Reparable Inventories On Aggregate Inventory Requirements And Mission Capability, Glenn R. Barney Sep 1995

The Effect Of Consolidating Two-Level Reparable Inventories On Aggregate Inventory Requirements And Mission Capability, Glenn R. Barney

Theses and Dissertations

One of the proposals of Lean Logistics is the relocation of many inventory assets to Intermediate Supply Points (ISPs). This research investigates the effect of consolidating Two Level Maintenance designated reparable asset inventories. The effects of interest are the potential reduction in aggregate inventory requirement and resulting savings and the effect of delayed issue of the assets on mission capability. The metric selected to measure the effect on mission capability for this study is the Not Mission Capable-Supply (NMCS) rate. A spreadsheet analysis of world-wide Two-Level Maintenance designated reparable asset demands over the study period is used to determine the …