Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending October 10, 2012, Margaret N. Rees Oct 2012

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending October 10, 2012, Margaret N. Rees

Walking Box Ranch

  • BLM and UNLV met with AECOM on 7/12/12 to review Walking Box Ranch (WBR) project progress, timing of posting of project bid documents, and the anticipated project calendar through December 2012.
  • BLM and UNLV met on 9/25/12 to update Mark Spencer, BLM’s new Field Manager for the Red Rock/Sloan Field Office, to brief him on UNLV participation at WBR, and to discuss the status of the operating agreement and major concerns that include timely completion of the operating agreement, which will allow completion of business plan and release of $500K for IT and security by UNLV’s president.
  • UNLV is continuing …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2012, Margaret N. Rees Jan 2012

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2012, Margaret N. Rees

Walking Box Ranch

  • UNLV’s President Smatresk has reiterated his commitment to the WBR project and has further committed full funding for IT and security costs.
  • UNLV participated in a one-half day meeting with BLM to discuss the future WBR operating agreement between BLM and UNLV; UNLV participated in a 1.5 day meeting to review the 100% Design drawings.
  • UNLV continues to wait on BLM for direction on how to mitigate the continuing deterioration of the ranch house.
  • Weather station research continues and has produced the following this past quarter. 1) Ground-source heat pump (GSHP) Vs Photovoltaic (PV) technology: A detailed analysis comparing these …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending October 10, 2011, Margaret N. Rees Oct 2011

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending October 10, 2011, Margaret N. Rees

Walking Box Ranch

  • UNLV participated in two meetings with BLM regarding updating the current Task Order, obtaining a two-year no-cost extension for the two Assistance Agreements, and to develop the future WBR operating agreement between BLM and UNLV.
  • Weather station progress included: 1) A study to review the recent developments in various building envelope components and their effects on the energy sustainability of a building has been completed and published, 2) Ground-source heat pump (GSHP) Vs Photovoltaic (PV) technology: A detailed comparison of ground source heat pumps and photo voltaics has been initiated, 3) A study to identify the most suitable and economically …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending July 10, 2009, Margaret N. Rees Jul 2009

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending July 10, 2009, Margaret N. Rees

Walking Box Ranch

  • UNLV participated in the 100% Design Concept Plan meeting, June 10-12, 2009 at the BLM Las Vegas Field Office and Walking Box Ranch (WBR), and provided comments toward proposed concepts for the museum and field, research, and training center at Walking Box Ranch.
  • A request for funding for road construction and repair at WBR was submitted to NDOT (6/24/09).
  • UNLV participated in the following meetings related to the search for renewable energy funding for the ranch: ARRA Implementation Workshop sponsored by Senator Reid (4/16); UNLV Stimulus Funding Workshop (4/17), Renewable energy meeting with UNLV engineering faculty (4/21), Harry Reid Center …