Hydroelectric power plants

Water Resource Management

Publication Year

Articles 1 - 5 of 5

Full-Text Articles in Construction Engineering

Dickey-Lincoln School Lakes Project Economic Analysis Study, New England Division, United States Army Engineer Division, Acres American Incorporated Jan 1981

Dickey-Lincoln School Lakes Project Economic Analysis Study, New England Division, United States Army Engineer Division, Acres American Incorporated

Dickey-Lincoln School Lakes Project

The purpose of this study was to perform an economic assessment of the Dickey-Lincoln School Lakes Project. This was accomplished by simulating the New England electrical supply system with and without the project and making a comparison of the resultant production costs.


Dickey-Lincoln School Lakes, Maine, Hydro-Power Decision, October 27, 1978, James B. Longley Jan 1978

Dickey-Lincoln School Lakes, Maine, Hydro-Power Decision, October 27, 1978, James B. Longley

Dickey-Lincoln School Lakes Project

The Dickey-Lincoln School Project would consist of two earthfill structures designed to produce peaking and modest intermediate load power from the St. John River The larger of the two dams, the Dickey Dam, would be located immediately above the confluence of the Allagash and St. John Rivers. The Lincoln School Dam would also be located on the Upper St. John River, eleven miles downstream from the Dickey Dam. The Dickey Dam would have a total length of 10,600 feet and a maximum height of 335 feet. The Lincoln School Dam is considerably smaller and would be 1,600 feet long and …


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix J: Coordination With Other Agencies & Public Involvement (Supplement), New England Division, United States Army Corps Of Engineers Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix J: Coordination With Other Agencies & Public Involvement (Supplement), New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

This agency will be particularly concerned about any impact which this project might have on any existing, proposed or known units of the National Park System, or any known historic, natural or environmental education sites which are currently part of , or eligible for, the National Landmark Program. This report is a planning aid for the proposed Dickey-Lincoln Dams and Reservoirs project in Maine. A number of endangered, rare, or unique animal species are known or suspected to occur in the project area.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division Jan 1977

Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

This draft EIS address the impacts of the dams and appurtenant structures. The marketing and transmission of power from Federal projects are the statutory responsibility of the Department of the Interior. Accordingly, they are conducting transmission line studies in the preparation of a draft EIS. The draft EIS for transmission line and marketing is scheduled to be submitted to the Council on Environmental Quality in February 1978. Both drafts will be combined and submitted as a Final Environmental Impact Statement in August 1978.


Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 Hydrology And Hydraulic Analysis: Section 1 - Climatology And Stream Flow, United States Army Corps Of Engineers, New England Division Jan 1967

Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 Hydrology And Hydraulic Analysis: Section 1 - Climatology And Stream Flow, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

This section I is the first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of …