Hydroelectric power plants

Oceanography and Atmospheric Sciences and Meteorology

Articles 1 - 5 of 5

Full-Text Articles in Construction Engineering

Dickey-Lincoln School Lakes Project Economic Analysis Study, New England Division, United States Army Engineer Division, Acres American Incorporated Jan 1981

Dickey-Lincoln School Lakes Project Economic Analysis Study, New England Division, United States Army Engineer Division, Acres American Incorporated

Dickey-Lincoln School Lakes Project

The purpose of this study was to perform an economic assessment of the Dickey-Lincoln School Lakes Project. This was accomplished by simulating the New England electrical supply system with and without the project and making a comparison of the resultant production costs.


Federal Water Pollution Control Act Section "404" Evaluation For Dickey-Lincoln School Lakes, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers Jan 1980

Federal Water Pollution Control Act Section "404" Evaluation For Dickey-Lincoln School Lakes, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The purpose of this report is to relate various aspects of the proposed Dickey-Lincoln School Lakes Hydroelectric Project to appropriate considerations defined by Section 404 of the Federal Water Pollution Control Act of 1972.


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix J: Coordination With Other Agencies & Public Involvement (Supplement), New England Division, United States Army Corps Of Engineers Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix J: Coordination With Other Agencies & Public Involvement (Supplement), New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

This agency will be particularly concerned about any impact which this project might have on any existing, proposed or known units of the National Park System, or any known historic, natural or environmental education sites which are currently part of , or eligible for, the National Landmark Program. This report is a planning aid for the proposed Dickey-Lincoln Dams and Reservoirs project in Maine. A number of endangered, rare, or unique animal species are known or suspected to occur in the project area.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division Jan 1977

Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

This draft EIS address the impacts of the dams and appurtenant structures. The marketing and transmission of power from Federal projects are the statutory responsibility of the Department of the Interior. Accordingly, they are conducting transmission line studies in the preparation of a draft EIS. The draft EIS for transmission line and marketing is scheduled to be submitted to the Council on Environmental Quality in February 1978. Both drafts will be combined and submitted as a Final Environmental Impact Statement in August 1978.


Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 Hydrology And Hydraulic Analysis: Section 1 - Climatology And Stream Flow, United States Army Corps Of Engineers, New England Division Jan 1967

Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 Hydrology And Hydraulic Analysis: Section 1 - Climatology And Stream Flow, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

This section I is the first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of …