Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 5 of 5

Full-Text Articles in Construction Engineering

The Adoption Of A Design Build Approach In Retrofit Projects – A Descriptive Case Study, Lloyd Scott Sep 2018

The Adoption Of A Design Build Approach In Retrofit Projects – A Descriptive Case Study, Lloyd Scott

Conference papers

The delivery Design Build projects across the built environment in Ireland has begun to take significant shape. There are many examples of the traditional are moving towards more collaborative practices. There exists support for the integration of a design build project approach in the retrofit realm where designer, client and developer can work collaboratively. As with the regular design build process the intent behind this collaborative approach is to encourage those associated with the built environment to consider how retrofit design and construction can contribute positively to addressing elements of climate change and the design build process. The opportunity to …


Poly Canyon Entryway Redesign, Antonio Emiliano Baldazo Jun 2018

Poly Canyon Entryway Redesign, Antonio Emiliano Baldazo

Architectural Engineering

Persistence of Vision investigates the relationship between past, present, and future perceptions of place in the Poly Canyon area. Persistence of Vision takes up the Cal Poly mantra of “learn by doing,” and explores its pedagogical value by engaging with theory, design, engineering and implementation. This project is manifest in the form of a series of signs in the so-called “architectural graveyard” area; with an eye towards changing the name, perceptions, and narratives about this place. This project hopes to create a recognition within the minds of students that this place is, and was intended to be, a place for …


Analyzing The Restoration Of The Oklahoma State Capitol From The Perspective Of The Design Build Process:A Descriptive Case Study, Lloyd Scott, J.E. Dunne Apr 2018

Analyzing The Restoration Of The Oklahoma State Capitol From The Perspective Of The Design Build Process:A Descriptive Case Study, Lloyd Scott, J.E. Dunne

Conference papers

Design Build projects in the built environment are moving towards more collaborative practices. The intent behind this collaborative approach is to encourage those associated with the built environment to consider how retrofit design and construction can contribute positively to addressing elements of climate change and the design build process. The opportunity to share the rich nature of the design build process in a unique environmentally and heritage focused project excited the authors. Secondly concerns about the way such projects are captured historically, and specifically the disciplinary knowledge and skills employed in the restoration of such a significant landmark building could …


Proceedings Of Arcom Doctoral Workshop Research Methodology, Lloyd Scott Mar 2018

Proceedings Of Arcom Doctoral Workshop Research Methodology, Lloyd Scott

Conference papers

Editorial

Editorial Welcome to this special doctoral workshop on Research Methodology which forms part of what is now a well-established support mechanism for researchers in the discipline of the Built Environment and more particularly construction management. The ARCOM doctoral series, around now for some seventeen years, has addressed many of the diverse research areas that PhD researchers in the discipline have chosen to focus on in their doctoral journey. This doctoral workshop has as an aim to offer an opportunity to explore and share research and the theoretical underpinnings facing PhD researchers within the construction and engineering sectors where the …


0845: Winslow Terry Collection, 1984-1985, Marshall University Special Collections Jan 2018

0845: Winslow Terry Collection, 1984-1985, Marshall University Special Collections

Guides to Manuscript Collections

Collection consists of two items: 1) One East Huntington Bridge Blueprint Binder (281 pages) Description: One light tan binder (19 x 12 in.) containing 281 pages of blueprints for the East Huntington Bridge located over the Ohio River and connecting WV 106 to OH 775. A reprint of the "West Virginia Department of Highways Plans for Construction" (State Project No. X306-106-0.00 07). The first page is inscribed: "W.Va. Dept. of Highways Project Engineer Stan Meadows gave these prints to Winslow Terry on Nov. 14, 1985"; 2) 1 each Photograph Album containing 163 photographs (5 x 3½ in.), a flattened penny, …