Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 3 of 3

Full-Text Articles in Construction Engineering

The Impact Of Project Delivery Methods On Dispute Occurrence In Public Highway Projects, Samaneh Nasrollahi, Ghada M. Gad, Alan Atalah Dec 2016

The Impact Of Project Delivery Methods On Dispute Occurrence In Public Highway Projects, Samaneh Nasrollahi, Ghada M. Gad, Alan Atalah

Master of Technology Management Plan II Graduate Projects

The construction industry is a complex and competitive industry in which different participants with different expertise, talents, and levels of knowledge work together to achieve their objectives and complete a project. Sine different participants with different interest involve in a construction project, therefore, conflicts arise and become inevitable. Conflicts in projects will cause an adversarial environment which result to disputes. Hence, if conflicts are not well managed and resolved in a timely manner, they quickly turn into disputes, which prevent the successful completion of the construction project, in terms of cost and time, and increasing the potential for poor project …


Implementation Of Integrated Project Delivery On Department Of Navy Military Construction Projects, Christopher S. Lee Aug 2013

Implementation Of Integrated Project Delivery On Department Of Navy Military Construction Projects, Christopher S. Lee

UNLV Theses, Dissertations, Professional Papers, and Capstones

The concept of the project delivery system refers to the overall processes by which a project is designed, constructed, and/or maintained. There are many different types of project delivery systems to fit particular situations involving the owner and his intended project. The project delivery system is what establishes the framework that enables a construction project to be developed and ultimately executed.

The construction industry has observed that projects (both private and public) frequently suffer from factors such as adversarial relationships, low roductivity, high inefficiency and rework, frequent contractual disputes concerning who was at fault, and lack of innovation. Not only …


Material And Energy Flow Analysis Of The Irish Construction Sector, Rachel Woodward Jan 2011

Material And Energy Flow Analysis Of The Irish Construction Sector, Rachel Woodward

Theses

A national flow model for concrete was developed using the framework of material and energy flow analysis. Using this framework, the Irish concrete material and energy cycles for the year 2007 were constructed by firstly analysing the material life cycle of concrete which consists of the three phases of production (including extraction of raw materials and manufacture of cement), usage into stock (ready-mix and other concrete products), and waste management. In this year, approximately 35Mt of raw materials were extracted to produce both 5Mt of cement and 33Mt of concrete, with 4.5Mt of cement going into the production of concrete. …