Articles 1 - 10 of 10

Full-Text Articles in Construction Engineering

Decision Making Processes For Bim Software Selection In The U.S. A.E.C. Industry: Developing A Unified, Streamlined Framework., Richelle Fosu Dec 2017

Decision Making Processes For Bim Software Selection In The U.S. A.E.C. Industry: Developing A Unified, Streamlined Framework., Richelle Fosu

Purdue Polytechnic Doctoral Dissertations

The use of Building Information Modeling (BIM) techniques and tools continues to gain popularity in the Architecture, Engineering and Construction (AEC) industry as more companies in the various sectors are utilizing it in one form or another. In this research, the decision-making process of construction firms with respect to the selection of BIM software for use is investigated. Through one on one interviews and gathered survey responses, a framework mapping out the various paths the exist in the decision-making process are explored. This data is then used to form a framework for BIM software selection in the construction sector of …


Case Study: Mitigating Schedule Impacts From Oshpd Regulations On Medical Equipment, Peter K. Lee Dec 2017

Case Study: Mitigating Schedule Impacts From Oshpd Regulations On Medical Equipment, Peter K. Lee

Construction Management

The vast majority of healthcare construction projects in the state of California work with OSHPD—Office of Statewide Health Planning and Development—to meet California’s Hospital Seismic Safety Law. While meeting the state’s Hospital Seismic Safety Law is important and even critical, working with OSHPD’s stringent regulations does imply additional concerns to be addressed by the project team. One concern regards the approval of bigger medical equipment and its impact on the overall construction schedule. This paper examines the factors that contribute to delays in the construction schedule, responsible parties for the delay, and responsibilities of each involved party. Based on an …


Mt. Carmel Shade Structure, Sonny Moraga, Adam Maclean, Julian Reyes, Christopher Carter Jun 2017

Mt. Carmel Shade Structure, Sonny Moraga, Adam Maclean, Julian Reyes, Christopher Carter

Architectural Engineering

The Mt. Carmel Shade Structure incorporated the efforts of students practicing Architectural Engineering and Construction Management disciplines. The project consisted of designing, engineering and constructing a steel frame structure for the benefit of Mt. Carmel Church and its associated preschool.


Construction Agility - An Integrated Management System, Remington J. Goodwin Jun 2017

Construction Agility - An Integrated Management System, Remington J. Goodwin

Liberal Arts and Engineering Studies

Construction Agility is a management system to be utilized by project managers to create a visual representation of work in progress on the jobsite. This visual component of Construction Agility increases awareness of job site activities among the general contractor, subcontractors, and visitors, thus increasing safety. The system is a Kanban, otherwise known as a batch system, that displays critical activities with physical moveable cards that display the task, the duration, and the proceeding party. There is a focus on handoffs which requires a willingness to open communication. The visual appeal and simplicity of the batch system for all to …


Shrinkage Cracking In Concrete Tilt-Up Construction, Stewart Hooks, Jack Robinson Jun 2017

Shrinkage Cracking In Concrete Tilt-Up Construction, Stewart Hooks, Jack Robinson

Architectural Engineering

The purpose of this project is to investigate a particular, undesirable cracking pattern in concrete tilt-up panels that, until now, did not have a known definite cause. The cause of this cracking pattern is hypothesized to be due to shrinkage restraint of the concrete panels. The cracking under investigation occurs at the bottom corners of the Tilt-Up panels, suggesting that the base of the panel is restrained from shrinkage. This project models various components of Tilt-Up Construction that have potential for restraining the panels from shrinking. This project consists of the following main components.

The first aspect of this project …


Mt Carmel Shade Structure, Julian Reyes, Sonny Moraga, Adam Maclean, Christopher Carter Jun 2017

Mt Carmel Shade Structure, Julian Reyes, Sonny Moraga, Adam Maclean, Christopher Carter

Architectural Engineering

A team of for students designed and constructed a shade structure for a local church and day care center. The group was responsible for developing a design which addressed the needs of the congregation as well as the needs of the toddler day care center. The team developed a steel framed scheme with a panelized metal roof which provided a long lasting solution and minimal maintenance costs.


Speculations On A City For Mars, Edouard Terzis May 2017

Speculations On A City For Mars, Edouard Terzis

School of Architecture - Theses

This thesis proposes the reinterpretation of architectural forms as the index of the constitution of the idea of the city. “Speculations on a City on Mars” is paradoxical in a sense as it superposes both the managerial representation of a city, that is Zoning, along with the speculative aspect of an extra-terrestrial city.


Offshore R+D Facility, Philip A. Marble May 2017

Offshore R+D Facility, Philip A. Marble

Bachelor of Architecture Theses - 5th Year

Design a Research + Development facility that merges with a functional Oil Rig. This center will house both a Marine Research Center and Oil rig Research + Development center. Both of these facilities will be in a separate structure than the Oil Rig but will have a connection back to the Living Quarter.


Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer May 2017

Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer

Architectural Engineering

The Modular House, located in Poly Canyon, has seen extensive damage since the last caretaker left nearly ten years ago. To prevent further damage and improve the safety and appeal of the structure, we are proposing a renovation of the existing building that removes the existing cladding and partitions. By the end of Spring Quarter 2017, the Modular House will have a guardrail system replacing the wood paneling on the walls and a new steel composite deck to replace the current flooring system. The structural steel framing system will remain as is.


Clothedral, Jacob T. Holmes, Andres Munoz, Sam Tenreiro Theis, Marta Blachowicz Mar 2017

Clothedral, Jacob T. Holmes, Andres Munoz, Sam Tenreiro Theis, Marta Blachowicz

Architectural Engineering

No abstract provided.