Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 4 of 4

Full-Text Articles in Construction Engineering

A Financial Impact Assessment Of Ld 1725: Stream Crossings, New England Environmental Finance Center, Muskie School Of Public Service Jan 2011

A Financial Impact Assessment Of Ld 1725: Stream Crossings, New England Environmental Finance Center, Muskie School Of Public Service

Water

This report looks at the potential financial impact of LD 1725 on the estimated 30,000 stream crossings in the State of Maine that would be affected by the law. Our research for this report included the analysis of nearly 2000 stream crossings and the data collection necessary for the development of extensive stream crossing replacement cost models. We found that the 1.2 bankfull requirements in LD 1725 would result in a 75% ‐ 250% increase in structure widths for stream crossing projects across the state. An upsize of this magnitude would increase the cost of replacing stream crossings statewide by …


Culvert Material Cost Comparison, New England Environmental Finance Center Nov 2010

Culvert Material Cost Comparison, New England Environmental Finance Center

Water

The following tables provide a detailed look at the role that culvert material and culvert diameter play in the overall cost of a culvert replacement project.


Culvert Material Cost Comparison, New England Environmental Finance Center Nov 2010

Culvert Material Cost Comparison, New England Environmental Finance Center

Economics and Finance

The following tables provide a detailed look at the role that culvert material and culvert diameter play in the overall cost of a culvert replacement project. Table 1 displays the cost per foot purchase price arranged by diameter size for the various culvert materials that are currently available. Table 2 displays the average additional culvert pipe material cost (increased cost to upsize minus original in-kind replacement cost) that would be incurred when upsizing a given diameter of culvert with a 50 foot length by factors of: 200%, 250% and 300%.


Augusta Me: The New Bridge Begets A New Planned Neighborhood, Molly Pulsifer, Richard Barringer Aug 2006

Augusta Me: The New Bridge Begets A New Planned Neighborhood, Molly Pulsifer, Richard Barringer

Planning

Construction of a new Third Bridge over the Kennebec River in Augusta offered the prospect of a new and handsome gateway to the city. Further, the resulting change in traffic patterns offered the City the chance to plan for a pattern of development quite different from what the city had experienced for the past half-century. The case study describes the planning and construction of the new bridge and corridors that re-routed traffic out of Augusta’s downtown and older neighborhoods, and created the opportunity for planned development adjacent to the corridor created by the new bridge. It goes on to describe …