Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 3 of 3
Full-Text Articles in Construction Engineering
Case Study: Mitigating Schedule Impacts From Oshpd Regulations On Medical Equipment, Peter K. Lee
Case Study: Mitigating Schedule Impacts From Oshpd Regulations On Medical Equipment, Peter K. Lee
Construction Management
The vast majority of healthcare construction projects in the state of California work with OSHPD—Office of Statewide Health Planning and Development—to meet California’s Hospital Seismic Safety Law. While meeting the state’s Hospital Seismic Safety Law is important and even critical, working with OSHPD’s stringent regulations does imply additional concerns to be addressed by the project team. One concern regards the approval of bigger medical equipment and its impact on the overall construction schedule. This paper examines the factors that contribute to delays in the construction schedule, responsible parties for the delay, and responsibilities of each involved party. Based on an …
Shrinkage Cracking In Concrete Tilt-Up Construction, Stewart Hooks, Jack Robinson
Shrinkage Cracking In Concrete Tilt-Up Construction, Stewart Hooks, Jack Robinson
Architectural Engineering
The purpose of this project is to investigate a particular, undesirable cracking pattern in concrete tilt-up panels that, until now, did not have a known definite cause. The cause of this cracking pattern is hypothesized to be due to shrinkage restraint of the concrete panels. The cracking under investigation occurs at the bottom corners of the Tilt-Up panels, suggesting that the base of the panel is restrained from shrinkage. This project models various components of Tilt-Up Construction that have potential for restraining the panels from shrinking. This project consists of the following main components.
The first aspect of this project …
Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer
Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer
Architectural Engineering
The Modular House, located in Poly Canyon, has seen extensive damage since the last caretaker left nearly ten years ago. To prevent further damage and improve the safety and appeal of the structure, we are proposing a renovation of the existing building that removes the existing cladding and partitions. By the end of Spring Quarter 2017, the Modular House will have a guardrail system replacing the wood paneling on the walls and a new steel composite deck to replace the current flooring system. The structural steel framing system will remain as is.