Open Access. Powered by Scholars. Published by Universities.®

Architecture Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 15 of 15

Full-Text Articles in Architecture

Arise (Certcoin)- Inspiring Demand For Sustainable Energy Skills, Barry Mcauley, Paul Mccormack, Andrew Hamilton, Eduardo Rebelo Sep 2021

Arise (Certcoin)- Inspiring Demand For Sustainable Energy Skills, Barry Mcauley, Paul Mccormack, Andrew Hamilton, Eduardo Rebelo

Conference papers

The European AEC Sector now faces impending challenges over the next decade concerning escalating climate targets. To reach these targets, it vital that the green economy deliver a better-skilled workforce and develops new competencies and methods of working. Training in the domain of digital construction technologies and processes, such as Building Information Modelling (BIM), are now seen as essential upskilling vehicles that must be embraced if the sector is to transition towards a greener agenda. To assist in meeting these training needs a selection of partners from the BIM EPA will partake in the Horizon 2020 ARISE project, aiming to …


A Proposal To Harmonize Bim And Iot Data Silos Using Blockchain Application, Zulkefly Abu Bakar, Malachy Mathews Dr Sep 2021

A Proposal To Harmonize Bim And Iot Data Silos Using Blockchain Application, Zulkefly Abu Bakar, Malachy Mathews Dr

Conference papers

The integration of Building Information Modelling (BIM) and Internet of Things (IoT) provide significant end-to-end benefits for the architecture, engineering, construction, and operations (AECO) industry. Example applications include on-site assembly services, data localization for built environment, occupancy performance measures and many other analyses that can be used to improve the built environment. However, silos in the BIM and IoT data exchange have impacted the digital process adoption in AECO industry, which aims to change the dynamics and behaviors of the current working process. Penzes, (2018) in his report, acknowledges the AECO industry as one of the most fragmented sectors with …


Digital Construction And Bim Research In Ireland 2016-2020, Barry Mcauley, Roger P. West, Alan V. Hore Aug 2021

Digital Construction And Bim Research In Ireland 2016-2020, Barry Mcauley, Roger P. West, Alan V. Hore

Conference papers

As the construction industry opens up post pandemic, new and significant challenges will demand considerable expertise, not least in financial viability, solving the housing crisis and facing the very significant climate change pressures to make the industry less wasteful and less carbon intensive. This presents an excellent opportunity to further inculcate aspects of lean construction, particularly BIM into many aspects of construction not traditionally associated with digital construction, provided the necessary expertise is available and known to exist. Following a well-received recent conference paper summarising BIM-related research published by academics in Ireland’s higher education institutions in 2020, this paper will …


Lessons From The Classroom – Assessing The Work Of Postgraduate Students To Support Better Hygrothermal Risk Assessment, Joseph Little, Beñat Arregi, Christian Bludau Jun 2021

Lessons From The Classroom – Assessing The Work Of Postgraduate Students To Support Better Hygrothermal Risk Assessment, Joseph Little, Beñat Arregi, Christian Bludau

Conference papers

The widespread adoption of transient simulation modelling tools by building design professionals to support hygrothermal risk assessment of building design specifications is a crucial component in a multi-pronged drive to reduce moisture risk in buildings. Structured upskilling is essential. Much can be learnt about the ways practitioners use such tools by reviewing the work of professional postgraduate student groups. Such review could inform the creation of a user protocol. Peer-review under the responsibility of the organizing committee of the ICMB21.


The Causes Of Surface Condensation And Mould, And The Responsibility Of Relevant Parties To Alleviate Them, Joseph Little Jun 2021

The Causes Of Surface Condensation And Mould, And The Responsibility Of Relevant Parties To Alleviate Them, Joseph Little

Reports

All over Ireland large numbers of people live in unsanitary conditions suffering poor indoor air quality, surface condensation and mould. Where the occupants are tenants the cause of the conditions and identification of the parties responsible can cause much stress. Condensation and mould growth on the internal surface of a room are caused by a combination of factors due to specific conditions. In severe cases, one of these factors may lead to surface condensation and/or mould growth, but in general, surface condensation and/or mould growth occurs when two or three of these occur together. Even though multiple causes and shared …


A Hermeneutic Phenomenological Study Into The Impact Of Bim On The Social Dynamics Of The Aec Professional In The Workplace., Malachy Mathews Dr. Mar 2021

A Hermeneutic Phenomenological Study Into The Impact Of Bim On The Social Dynamics Of The Aec Professional In The Workplace., Malachy Mathews Dr.

Doctoral

A review of the literature published surrounding new digital design and construction technologies and associated processes described within the Architecture, Engineering, and Construction (AEC) community as Building Information Modelling (BIM) or Virtual Design and Construction (VDC) reveals a gap in the theoretical understanding of the impact these technologies are having on professionals who work in this industry. The central aim of this research is to discover if there has been a shift in social dynamics as a result of the adoption of BIM in the workplace and, if there has been, to discuss the meaning of this for the industry …


To What Extent Can Innovative International Project Delivery Strategies (Which Leverage Bim) Improve The Cost Certainty Of Large Complex Public Procurement Projects In The Context Of Irish Public Procurement?, Bim Tudublin, Roqaya Abouklaib Jan 2021

To What Extent Can Innovative International Project Delivery Strategies (Which Leverage Bim) Improve The Cost Certainty Of Large Complex Public Procurement Projects In The Context Of Irish Public Procurement?, Bim Tudublin, Roqaya Abouklaib

Capstone Reports

Cost overrun is one of the biggest issues in the construction sector, and cost certainty is one of the main aims of the public construction sector in Ireland. Studies have shown that multi-disciplinary collaboration will benefit a construction project throughout its lifecycle. BIM, Lean, and IPD are independent methodologies that encourage collaborative work, and there are existent effective synergies among these concepts. The synergetic innovative international strategies were utilised for delivering large complex projects successfully globally, and many authors have studied large complex public projects that have adopted innovative international project delivery strategies collaboratively and have shown that the cost …


A Critical Analysis Of The Application Of Augmented Reality (Ar) For Monitoring And Documentation Of Construction Site Progress In The Irish Aec Industry., Bim Tudublin, Lukasz Sarnot Jan 2021

A Critical Analysis Of The Application Of Augmented Reality (Ar) For Monitoring And Documentation Of Construction Site Progress In The Irish Aec Industry., Bim Tudublin, Lukasz Sarnot

Capstone Reports

Sarnot, L. (2021) A critical analysis of the application of augmented reality (AR) for monitoring and documentation of construction site progress in the Irish AEC industry, Capstone Project from the MSc in aBIMM


A Critical Examination Of Visual Programming And Generative Design For The Compliance Checking Of Open Plan Office Layouts Against Hse Guidelines Post Covid-19., Bim Tudublin, Ronan Byrne Jan 2021

A Critical Examination Of Visual Programming And Generative Design For The Compliance Checking Of Open Plan Office Layouts Against Hse Guidelines Post Covid-19., Bim Tudublin, Ronan Byrne

Capstone Reports

The purpose of this study is to explore the feasibility of Visual Programming (VP) and Generative Design (GD) in assisting employers review open plan office layouts against Ireland’s HSE guidelines implemented in May 2020 in response to Covid-19. The pandemic has affected all areas of life with workplace standards requiring a complete overhaul. This study will attempt to ascertain compliance with natural ventilation and social distancing requirements through the completion of an experimental research study, utilising Computational Design (CD) tools. A GD study will be undertaken to provide the designer with numerous office layout design solutions to evaluate and evolve. …


Opportunities In The Irish Reinforced Concrete Industry For Lean And Bim Adoption, Bim Tudublin, Kieran Mcconnell Jan 2021

Opportunities In The Irish Reinforced Concrete Industry For Lean And Bim Adoption, Bim Tudublin, Kieran Mcconnell

Capstone Reports

The Irish Reinforced Concrete (RC) sector has yet to realise the full potential of Building Information Modelling (BIM) and Lean construction. The positive impacts and benefits of both BIM and Lean in the wider Architecture, Engineering and Construction sector are widely recognised; many of these are transferable to the RC sector, but there is limited research and knowledge on practical transference, uses and advantages. This research aims to fill some of the existing knowledge gaps by examining BIM and Lean adoption and awareness in the Irish RC sector across sub-sectors, professions, and organisational levels, and by exploring opportunities for increasing …


A Critical Analysis Of How Large Irish Architectural Practices Responded To Initial Covid-19 Restrictions And The Affect Implementing Remote Working Had On Bim Processes, Policies, And People, Bim Tudublin, John Mcenroy Jan 2021

A Critical Analysis Of How Large Irish Architectural Practices Responded To Initial Covid-19 Restrictions And The Affect Implementing Remote Working Had On Bim Processes, Policies, And People, Bim Tudublin, John Mcenroy

Capstone Reports

The unprecedent events which transpired in the 88-day period from the 31st of December 2019 to the 27th of March 2020 have changed the world in which we live and work. The outbreak of Coronavirus disease 19 (COVID-19) and the ensuing pandemic which has evolved are descripted as one in a hundred-year events. This paper researched and critically analyses the operations which large Irish Architecture firms initiated during this period in order to facilitate the ability of its employees working from a remote location, focusing on how the People, Processes and Policies of BIM (3 Ps of BIM); adapted to …


To What Extent Can Lean Construction Processes And Principles Be Utilised In The Design Stage Of A Bim Project In The Irish Design And Construction Industry, Bim Tudublin, Barry Sheramn Jan 2021

To What Extent Can Lean Construction Processes And Principles Be Utilised In The Design Stage Of A Bim Project In The Irish Design And Construction Industry, Bim Tudublin, Barry Sheramn

Capstone Reports

Although different in many ways, Building Information Modelling (BIM) and Lean Construction are two processes that are having a significant impact on the Design & Construction Industry. In recent years, the Irish AECO industry has seen a tenfold increase across numerous construction disciplines with the adoption of new workflows and processes centred around both BIM and Lean methodologies. Existing literature identifies a strong synergistic relationship between the two processes and highlights the opportunity for Lean processes and principles to be implemented into the design stage workflow. This paper investigated existing literature relating to several lean processes currently implemented in the …


Should Acoustic Simulation Technology Be Utilised In Architectural Practice? Does It Have The Potential For Bim Integration?, Bim Tudublin, Keith Harvey Jan 2021

Should Acoustic Simulation Technology Be Utilised In Architectural Practice? Does It Have The Potential For Bim Integration?, Bim Tudublin, Keith Harvey

Capstone Reports

The research presented in this paper, firstly, aims to convey the importance of our acoustic environment through focusing on the effects of undesirable acoustic conditions on cognitive abilities in spaces where cognitive performance is of the utmost concern, our learning environments. Secondly, it aims to investigate current state-of-the-art acoustic simulation methods, available platforms, and their levels of interoperability with architectural BIM authoring software. Structured interviews were carried out with 7 Irish architects and architectural technologists to determine if a disconnection between architectural design and acoustic performance exists and to identify the advantages and disadvantages of current workflows for acoustic performance …


An Examination Of The Use Of Geotechnical Bim To Provide Value Engineering Solutions For Coastal Infrastructure., Bim Tudublin, Eric Brennan Jan 2021

An Examination Of The Use Of Geotechnical Bim To Provide Value Engineering Solutions For Coastal Infrastructure., Bim Tudublin, Eric Brennan

Capstone Reports

The digitisation of construction is taking root as Building Information Modelling is becoming more prevalent across the industry. From an Irish context, the adoption rate of BIM has been slow; nationally its advantages and merits have been welcomed and the appropriate government support is either available, soon to be implemented or in the early conceptual stage. Within the Irish governments Project Ireland 2040 framework there are significant infrastructure developments looming ahead, in particular regarding ports and harbours. The importance of this type of infrastructure is only further compounded due to the UK’s departure from the EU and the need for …


A Risk Framework For The Delivery Of Long-Term Performance Through The Large-Scale Energy Focused Retrofit Of Housing, Seamus Harrington, Mark Mulville Dr Jan 2021

A Risk Framework For The Delivery Of Long-Term Performance Through The Large-Scale Energy Focused Retrofit Of Housing, Seamus Harrington, Mark Mulville Dr

Conference papers

The 2019 Climate Action Plan (Ireland) seeks to retrofit approximately 500,000 existing homes to attain a B2 Building Energy Rating by 2030. Although not without merit, this presents a number of risks. The authors, through a review of relevant literature and a survey of leading experts in the field of domestic retrofit, set out to explore if and how the implementation, execution, and performance of retrofit strategies that utilise a uniform approach to the retrofit of the decidedly non-uniform existing dwelling stock could create un-intended consequences. It is demonstrated how issues related to indoor air quality, comfort and overheating may …