Open Access. Powered by Scholars. Published by Universities.®
- Keyword
- Publication
Articles 1 - 4 of 4
Full-Text Articles in Architecture
What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan
What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan
Conference papers
There is an acceptance that BIM, via data management, can be integrated with FM to reduce costs during the Operations and Maintenance stage of a project. However, what has not been documented is the ‘on the ground’ reality which can be reviewed as a lessons learnt exercise to improve the implementation of BIM FM for future projects. This case study sets out to explore the realities of a client’s adoption of BIM based upon the actual experience of the Greenway Hub. Rather than relying on anecdotal evidence the research was based upon the real practices and experiences of the Dublin …
Bicp Global Bim Study - Lessons For Ireland’S Bim Programme, Barry Mcauley, Alan Hore, Roger West
Bicp Global Bim Study - Lessons For Ireland’S Bim Programme, Barry Mcauley, Alan Hore, Roger West
Reports
The Construction IT Alliance (CitA) has been promoting the benefits of digitisation in the construction and engineering industry in Ireland since its formation back in 2002. Whilst the Alliance has always strived to ensure that its members are exposed to a wide spectrum of contemporary digital tools and processes, the concept of Building Information Modelling (BIM) has dominated the focus of its activities over the past five years.
BIM can be described as a digital tool that facilitates everybody to better understand a building or structure through the use of a digital model which draws on a range of data …
Compact Facility For Testing Steady And Transient Thermal Performance Of Building Walls, Aimee Byrne, Gerard Byrne, Anthony Robinson
Compact Facility For Testing Steady And Transient Thermal Performance Of Building Walls, Aimee Byrne, Gerard Byrne, Anthony Robinson
Articles
Energy efficiency retrofit of buildings represents a key effort in reducing EU energy demand by 20% by 2020. However, predictions tend to overestimate savings by large percentages. The shortfall in savings can be attributed to incorrect predictive techniques, comfort takeback along with other behavioural and workmanship variables. Common predictive techniques related to heat loss tend to be based on the U-value of the building envelope. This paper presents the design of a more straightforward and compact version of the traditional Hot-Box apparatus (measures U-value) which instead determines the thermal resistance of samples of building envelope. U-value includes the need to …
Linking Geospatial Engineering Into Collaborative Multidisciplinary Bim Projects - An Educational Perspective, Avril Behan, Helen Murray, Jonathan Argue, Ronan Hogan, Audrey Martin, Pat O'Sullivan, Robert Moore, Malachy Mathews
Linking Geospatial Engineering Into Collaborative Multidisciplinary Bim Projects - An Educational Perspective, Avril Behan, Helen Murray, Jonathan Argue, Ronan Hogan, Audrey Martin, Pat O'Sullivan, Robert Moore, Malachy Mathews
Conference papers
This paper describes the background to and execution of a postgraduate project undertaken by students on DIT's MSc in Geospatial Engineering (GeoEng) in support of a project on level 2 BIM being undertaken by students on the MSc in applied Building Information Modelling & Management (aBIMM) around the retrofit of and new build extension to the Grangegorman Clock Tower Building. In support of this requirement, an external and internal survey of the existing structure and its surrounding topography was required. The aBIMM students and staff acted as the Design Team who subcontracted the Geo Eng group who were organised into …