Open Access. Powered by Scholars. Published by Universities.®
- Institution
- Publication Year
Articles 1 - 15 of 15
Full-Text Articles in Architecture
Ua3/9/2 Honors College & International Center, Rosstarrant Architects
Ua3/9/2 Honors College & International Center, Rosstarrant Architects
WKU Archives Records
Honors College & International Center, RossTarrant Architects, ca. 2017, 8 drawings, 17 x 11,
- Aerial view
- Elevation Study
- Side Elevation
- Rear Elevation
- Landscape Plan
- First, Second & Third Floor Plans
Records housed in WKU President - Ransdell Subject Files.
Ua3/1/5/3 President's Office-Cherry Campus Building Campaign, Wku Archives
Ua3/1/5/3 President's Office-Cherry Campus Building Campaign, Wku Archives
WKU Archives Collection Inventories
Records created by the President's Office during the Henry Cherry administration regarding the construction of WKU. This series is not completely processed.
Ua11/3 Public Affairs Building & Construction File, Wku Archives
Ua11/3 Public Affairs Building & Construction File, Wku Archives
WKU Archives Collection Inventories
Records regarding campus buildings and construction projects used for writing press releases. Includes construction information sheets, press releases and clippings from newspapers around the state.
Ua1c11/73 C. Haskel Mccauley Photo Collection, Wku Archives
Ua1c11/73 C. Haskel Mccauley Photo Collection, Wku Archives
WKU Archives Collection Inventories
Photographs by C. Haskel McCauley
Ua3/9/2 President's Office-Ransdell Subject File, Wku Archives
Ua3/9/2 President's Office-Ransdell Subject File, Wku Archives
WKU Archives Collection Inventories
Subject files created by the President’s Office during the Gary Ransdell administration.
Ua61/3 Wku Nursing & Physical Therapy - The Medical Center - Wku Health Sciences Complex, Wku Health & Human Services
Ua61/3 Wku Nursing & Physical Therapy - The Medical Center - Wku Health Sciences Complex, Wku Health & Human Services
WKU Archives Records
Fundraising brochure regarding The Medical Center – WKU Health Sciences Complex constructed from 2012 through 2014. Features architectural renderings of each floor.
A Financial Impact Assessment Of Ld 1725: Stream Crossings, New England Environmental Finance Center, Muskie School Of Public Service
A Financial Impact Assessment Of Ld 1725: Stream Crossings, New England Environmental Finance Center, Muskie School Of Public Service
Water
This report looks at the potential financial impact of LD 1725 on the estimated 30,000 stream crossings in the State of Maine that would be affected by the law. Our research for this report included the analysis of nearly 2000 stream crossings and the data collection necessary for the development of extensive stream crossing replacement cost models. We found that the 1.2 bankfull requirements in LD 1725 would result in a 75% ‐ 250% increase in structure widths for stream crossing projects across the state. An upsize of this magnitude would increase the cost of replacing stream crossings statewide by …
Ua3/4/2 President's Office-Downing Construction File, Wku Archives
Ua3/4/2 President's Office-Downing Construction File, Wku Archives
WKU Archives Collection Inventories
Records regarding the planning, construction and maintenance of buildings on the WKU campus. Downing held several positions at WKU before becoming president. Some of these records date to that earlier period.
Culvert Material Cost Comparison, New England Environmental Finance Center
Culvert Material Cost Comparison, New England Environmental Finance Center
Water
The following tables provide a detailed look at the role that culvert material and culvert diameter play in the overall cost of a culvert replacement project.
Ua3/3/4 President's Office-Thompson Construction File, Wku Archives
Ua3/3/4 President's Office-Thompson Construction File, Wku Archives
WKU Archives Collection Inventories
Construction file regarding construction of new buildings, renovation of existing buildings and bond issues during Kelly Thompson's tenure as WKU President.
Ua30/1/1 Planning, Design & Construction Blueprints, Drawings & Plans, Wku University Archives, Ryun Warren
Ua30/1/1 Planning, Design & Construction Blueprints, Drawings & Plans, Wku University Archives, Ryun Warren
WKU Archives Collection Inventories
Blueprints, drawings and plans of WKU buildings and campus created by the Department of Planning, Design & Construction.
Managing Risks Associated With The Jbcc(Principal Building Agreement) From Thesouth African Contractor’S Perspective, Ayman Ahmed Ezzat Othman, Nishani Harinarain
Managing Risks Associated With The Jbcc(Principal Building Agreement) From Thesouth African Contractor’S Perspective, Ayman Ahmed Ezzat Othman, Nishani Harinarain
Architectural Engineering
Construction is a complex and risky business. It is a time-consuming process involving a multitude of organisations with different objectives and skills. In addition, increasing client expectations coupled with the technological development of materials and equipment made the construction industry subject to more risks than any other industry. Contracts are essential tools for organising the relationship between involved parties and managing associated risk. For years the South African construction industry had a very poor reputation in managing construction risks. In order to improve the image of the South African construction industry and to assist contractors to develop their proper risk …
Ua3/9/2 Student Plaza, Wku President's Office
Ua3/9/2 Student Plaza, Wku President's Office
WKU Archives Records
Fundraising brochure for the WKU student plaza development plan.
Ua11/2 Construction Bonds, Wku Public Affairs
Ua11/2 Construction Bonds, Wku Public Affairs
WKU Archives Records
Press release regarding construction bonds for Keen Hall, Poland Hall, Pearce-Ford Tower and Downing University Center.
Ua3/1/2 Letter To Roemer Brothers, Wku President's Office
Ua3/1/2 Letter To Roemer Brothers, Wku President's Office
WKU Archives Records
Letter from the WKU President's Office to Roemer Brothers of Bowling Green regarding the construction of a temporary gymnasium. The letter outlines the specifications for the building.