Open Access. Powered by Scholars. Published by Universities.®

Architecture Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 3 of 3

Full-Text Articles in Architecture

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix J: Coordination With Other Agencies & Public Involvement (Supplement), New England Division, United States Army Corps Of Engineers Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix J: Coordination With Other Agencies & Public Involvement (Supplement), New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

This agency will be particularly concerned about any impact which this project might have on any existing, proposed or known units of the National Park System, or any known historic, natural or environmental education sites which are currently part of , or eligible for, the National Landmark Program. This report is a planning aid for the proposed Dickey-Lincoln Dams and Reservoirs project in Maine. A number of endangered, rare, or unique animal species are known or suspected to occur in the project area.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix B: Alternative Power Transmission Corridors, United States Department Of Energy, United States Department Of The Interior Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix B: Alternative Power Transmission Corridors, United States Department Of Energy, United States Department Of The Interior

Dickey-Lincoln School Lakes Project

This report identifies alternative corridors of land within which transmission lines could be routed and details various impacts on the environment which would be associated with introduction of transmission facilities. Many alternative corridor locations were identified (see Figure 1-1). Identification of these alternative transmission corridors was a complex process, since the number of potential corridors capable of connecting the various substations was myriad; the 'least desirable' potential corridors, i.e., those where transmission facilities might have entailed severest impacts on the environment, had to be eliminated from consideration before alternative corridors could be delineated. Identified alternative corridor locations were subsequently evaluated …


Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers Jan 1976

Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers

Dickey-Lincoln School Lakes Project

The first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of the Dickey and Lincoln …