Arise (Certcoin)- Inspiring Demand For Sustainable Energy Skills, Barry Mcauley, Paul Mccormack, Andrew Hamilton, Eduardo Rebelo Sep 2021

Arise (Certcoin)- Inspiring Demand For Sustainable Energy Skills, Barry Mcauley, Paul Mccormack, Andrew Hamilton, Eduardo Rebelo

Conference papers

The European AEC Sector now faces impending challenges over the next decade concerning escalating climate targets. To reach these targets, it vital that the green economy deliver a better-skilled workforce and develops new competencies and methods of working. Training in the domain of digital construction technologies and processes, such as Building Information Modelling (BIM), are now seen as essential upskilling vehicles that must be embraced if the sector is to transition towards a greener agenda. To assist in meeting these training needs a selection of partners from the BIM EPA will partake in the Horizon 2020 ARISE project, aiming to …


Digital Construction And Bim Research In Ireland 2016-2020, Barry Mcauley, Roger P. West, Alan V. Hore Aug 2021

Digital Construction And Bim Research In Ireland 2016-2020, Barry Mcauley, Roger P. West, Alan V. Hore

Conference papers

As the construction industry opens up post pandemic, new and significant challenges will demand considerable expertise, not least in financial viability, solving the housing crisis and facing the very significant climate change pressures to make the industry less wasteful and less carbon intensive. This presents an excellent opportunity to further inculcate aspects of lean construction, particularly BIM into many aspects of construction not traditionally associated with digital construction, provided the necessary expertise is available and known to exist. Following a well-received recent conference paper summarising BIM-related research published by academics in Ireland’s higher education institutions in 2020, this paper will …


Improving The Sustainability Of The Built Environment By Training Its Workforce In More Efficient And Greener Ways Of Designing And Constructing Through The Horizon2020 Bimcert Project, Barry Mcauley, Avril Behan Sep 2019

Improving The Sustainability Of The Built Environment By Training Its Workforce In More Efficient And Greener Ways Of Designing And Constructing Through The Horizon2020 Bimcert Project, Barry Mcauley, Avril Behan

Conference papers

The construction industry consumes up to 50% of mineral resources excavated from nature, generates about 33% of CO2 present in the atmosphere and is responsible for 40% of total global energy through both construction and operation of buildings. The realisation that current pervasive construction practices now face globalization, sustainability, and environmental concerns, as well as ever-changing legislation requirements and new skills needed for the information age has resulted in technologies such as Building Information Modelling (BIM) becoming a key enabler in navigating these barriers. To assist in overcoming these barriers, a number of funding initiatives have been put in place …


Centres Of Excellence And Roadmaps For Digital Transition: Lessons For Ireland’S Construction Industry, Barry Mcauley, Alan Hore, Roger West Sep 2019

Centres Of Excellence And Roadmaps For Digital Transition: Lessons For Ireland’S Construction Industry, Barry Mcauley, Alan Hore, Roger West

Conference papers

Like most sectors in today’s working world, construction businesses are challenged to work in an increasingly digitised world with sophisticated demands from intelligent clients. So much has been written about the inefficiencies of the construction industry, its fragmentation, lack of collaboration, low margins, adversarial pricing, poor productivity, financial fragility, lack of research and development, poor industry image and relatively weak use of digital solutions. The Irish government recognises the importance of digital innovation to address many of the challenges the construction industry faces. With recent high profile reports of escalating spend on signature public sector projects and weak productivity performance …


Bim In Ireland 2019: A Study Of Bim Maturity And Diffusion In Ireland, Barry Mcauley, Alan Hore, Roger West Sep 2019

Bim In Ireland 2019: A Study Of Bim Maturity And Diffusion In Ireland, Barry Mcauley, Alan Hore, Roger West

Conference papers

In 2017, the BIM Innovation Capability Programme team applied five macro BIM maturity conceptual models to capture the capability of the Irish construction industry and assess its BIM maturity. The results found that while Ireland is mature for modelling processes, it is less developed with regards to collaboration processes and policies. Ireland also ranked poorly when it came to regulatory frameworks, measurements and benchmarks compared to a number of countries which also applied the same conceptual models. At the time, the findings highlighted that Ireland’s diffusion dynamic was middle out, meaning that larger organisations or industry associations were pushing the …


An Investigation Into Current Procurement Strategies That Promote Collaboration Through Early Contractor Involvement With Regards To Their Suitability For Irish Public Work Projects, Barry Mcauley, Frederic Lefebvre Sep 2019

An Investigation Into Current Procurement Strategies That Promote Collaboration Through Early Contractor Involvement With Regards To Their Suitability For Irish Public Work Projects, Barry Mcauley, Frederic Lefebvre

Conference papers

Previous research has established that multi-disciplinary collaboration will benefit a construction project throughout its lifecycle. While Lean Construction, Building Information Modelling (BIM), and Integrated Project Delivery (IPD) can all be viewed as separate processes which add independent value to a project, they are more effective when used in partnership with each other. In order to ensure the high levels of collaboration expected for these processes to work in unison, the early involvement of the Contractor is paramount. Early contractor involvement within the design process can ensure a more focused integrated project team, improvement of both constructability and cost certainty, as …


From Roadmap To Implementation: Lessons For Ireland’S Digital Construction Programme, Barry Mcauley, Alan Hore, Roger West Sep 2019

From Roadmap To Implementation: Lessons For Ireland’S Digital Construction Programme, Barry Mcauley, Alan Hore, Roger West

Conference papers

As part of their Future of Construction initiative in 2018 the World Economic Forum published an action plan to accelerate Building Information Modelling adoption. The WEF report highlighted actions that companies, industry organisations and governments are advised to implement to accelerate BIM adoption and better capitalise on delivering better project outcomes. According the authors of the report BIM is seen as the centrepiece of the construction industry’s digital transformation, however they acknowledged that BIM adoption globally remain slow. Anecdotal experience would suggest that BIM usage in Ireland is also very low and that a similar initiative or an adaptation of …


Development Of A Framework To Support The Effective Adoption Of Bim In The Public Sector: Lessons For Ireland, Shiyao Kuang, Alan Hore, Barry Mcauley, Roger West Jun 2019

Development Of A Framework To Support The Effective Adoption Of Bim In The Public Sector: Lessons For Ireland, Shiyao Kuang, Alan Hore, Barry Mcauley, Roger West

Conference papers

Building Information Modelling (BIM) has been formally adopted by many countries with the promise of creating greater economic, social and sustainability benefits. Several authors and institutions have presented alternative BIM policies and tactics which have been adopted by developed countries. However, there is evidence to indicate that BIM adoption theories are not well established and, in particular, the linkage between BIM public sector adoption strategy outcomes and their contribution to achieving Government policy objectives are underdeveloped. This paper will present the outcome of the first phase of a systematic literature review of published studies (including journal papers and noteworthy international …


The Adoption Of A Design Build Approach In Retrofit Projects – A Descriptive Case Study, Lloyd Scott Sep 2018

The Adoption Of A Design Build Approach In Retrofit Projects – A Descriptive Case Study, Lloyd Scott

Conference papers

The delivery Design Build projects across the built environment in Ireland has begun to take significant shape. There are many examples of the traditional are moving towards more collaborative practices. There exists support for the integration of a design build project approach in the retrofit realm where designer, client and developer can work collaboratively. As with the regular design build process the intent behind this collaborative approach is to encourage those associated with the built environment to consider how retrofit design and construction can contribute positively to addressing elements of climate change and the design build process. The opportunity to …


Ireland’S Bim Macro Adoption Study: Establishing Ireland’S Bim Maturity, Barry Mcauley, Alan Hore, Roger West, Mohamad Kassem, Shiyao Kuang Nov 2017

Ireland’S Bim Macro Adoption Study: Establishing Ireland’S Bim Maturity, Barry Mcauley, Alan Hore, Roger West, Mohamad Kassem, Shiyao Kuang

Conference papers

Since 2016 the BIM Innovation Capability Programme (BICP) has captured the capability of the Irish Construction Industry’s and the Higher Education Institutes’ (HEIs) response to the increased requirement for BIM on Irish construction and engineering projects. One of the primary responsibilities of the BICP research team is to collate data to assist the National BIM Council of Ireland in the formulation of a National BIM Roadmap. To assist the Council with this task the BICP research team applied five macro BIM maturity conceptual models to assess Ireland’s BIM maturity. The results from the models were further utilised to develop a …


Stewardship Of International Bim Programmes: Lessons For Ireland, Barry Mcauley, Alan Hore, Roger West, Shiyao Kuang Nov 2017

Stewardship Of International Bim Programmes: Lessons For Ireland, Barry Mcauley, Alan Hore, Roger West, Shiyao Kuang

Conference papers

The support by central government of national Building Information Modelling (BIM) programmes is common throughout the developed world today. To further understand how the different international governments have supported their BIM programmes the BIM Innovation Capability Programme (BICP) research team in Ireland recently completed a comprehensive Global BIM Study to help inform the National BIM Council (NBC) of Ireland in developing a Roadmap to Digital Transition for Ireland’s Construction Sector. This paper details the findings of a more concentrated investigation on a selection of jurisdictions on how particular international BIM programmes are orgainsed, managed and the level of governmental support …


What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan Nov 2017

What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan

Conference papers

There is an acceptance that BIM, via data management, can be integrated with FM to reduce costs during the Operations and Maintenance stage of a project. However, what has not been documented is the ‘on the ground’ reality which can be reviewed as a lessons learnt exercise to improve the implementation of BIM FM for future projects. This case study sets out to explore the realities of a client’s adoption of BIM based upon the actual experience of the Greenway Hub. Rather than relying on anecdotal evidence the research was based upon the real practices and experiences of the Dublin …


Establishing The Key Pillars Of Innovation Required To Execute A Successful Bim Strategy Within A Construction Sme In Ireland, Barry Mcauley, Patrick Carroll Nov 2017

Establishing The Key Pillars Of Innovation Required To Execute A Successful Bim Strategy Within A Construction Sme In Ireland, Barry Mcauley, Patrick Carroll

Conference papers

The recent resurgence of the Irish Construction Industry comes at a time of global transition towards an information revolution, with technology now playing a vital role within our post-recessionary society. BIM is now seen as a core technology at the forefront of this transformational change which can present Construction SMEs with opportunities to new financial ventures. If any SME organisation is to be successful with BIM adoption then innovation must be the starting point. The aim of this paper is to establish the enabling factors required for innovating a BIM strategy within a SME Construction Organisation. The methodology involved a …


Bim+Blockchain: A Solution To The Trust Problem In Collaboration?, Malachy Mathews, Dan Robles, Brian Bowe Aug 2017

Bim+Blockchain: A Solution To The Trust Problem In Collaboration?, Malachy Mathews, Dan Robles, Brian Bowe

Conference papers

This paper provides an overview of historic and current organizational limitations emerging in the Architecture, Engineering, Construction, Building Owner / Operations (AECOO) Industry. It then provides an overview of new technologies that attempt to mitigate these limitations. However, these technologies, taken together, appear to be converging and creating entirely new organizational structures in the AEC industries. This may be characterized by the emergence of what is called the Network Effect and it’s related calculus. This paper culminates with an introduction to Blockchain Technology (BT) and it’s integration with the emergence of groundbreaking technologies such as Internet of Things (IoT), Artificial …


Bim Innovation Capability Programme Of Ireland, Barry Mcauley, Alan Hore, Roger West Jul 2017

Bim Innovation Capability Programme Of Ireland, Barry Mcauley, Alan Hore, Roger West

Conference papers

The Irish Government has requested that Enterprise Ireland, an organisation responsible for the development and growth of Irish enterprises in world markets to actively promote the use of BIM in Ireland. This promotion has taken the form of an opportunity for Enterprise Ireland clients to apply for a grant under their BIM Enable and BIM Implementation schemes and also through their funding of the BIM Innovation Capability Programme (BICP) of Ireland. The BICP is a two-year project (2016-2018) which seeks to capture the capability of the Irish Construction Industry and the Higher Education Institutes to respond to the increased requirement …


Linking Geospatial Engineering Into Collaborative Multidisciplinary Bim Projects - An Educational Perspective, Avril Behan, Helen Murray, Jonathan Argue, Ronan Hogan, Audrey Martin, Pat O'Sullivan, Robert Moore, Malachy Mathews Jan 2017

Linking Geospatial Engineering Into Collaborative Multidisciplinary Bim Projects - An Educational Perspective, Avril Behan, Helen Murray, Jonathan Argue, Ronan Hogan, Audrey Martin, Pat O'Sullivan, Robert Moore, Malachy Mathews

Conference papers

This paper describes the background to and execution of a postgraduate project undertaken by students on DIT's MSc in Geospatial Engineering (GeoEng) in support of a project on level 2 BIM being undertaken by students on the MSc in applied Building Information Modelling & Management (aBIMM) around the retrofit of and new build extension to the Grangegorman Clock Tower Building. In support of this requirement, an external and internal survey of the existing structure and its surrounding topography was required. The aBIMM students and staff acted as the Design Team who subcontracted the Geo Eng group who were organised into …


Framework For Formative Assessment Learning Strategies In Built Environment Higher Education Programmes, Lloyd Scott, Christopher Fortune Sep 2012

Framework For Formative Assessment Learning Strategies In Built Environment Higher Education Programmes, Lloyd Scott, Christopher Fortune

Conference papers

Formative assessment has begun to be recognized as a driving force for enhancing student learning. This paper addresses the context of Built Environment (BE) undergraduate programmes and the findings from a research project in the context of the changing Higher Education (HE) environment. The analysis of the literature on formative assessment shows that there is a common concern among the educational researchers about the function and position of assessment in HE today. The overall aim of this research is to contribute to an improvement in the quality of student learning in BE undergraduate education through the development of a theoretical …


Use Of Building Information Modelling In Responding To Low Carbon Construction Innovations: An Irish Perspective., Barry Mcauley, Alan V. Hore, Roger West Jul 2012

Use Of Building Information Modelling In Responding To Low Carbon Construction Innovations: An Irish Perspective., Barry Mcauley, Alan V. Hore, Roger West

Conference papers

At present the Irish construction industry is facing one of its most uncertain and challenging periods and will see major cuts in all areas of the economy in 2012. Despite this, Ireland pushes forward in sustainability initiatives with the Government ruling that environmentally-friendly policies are to get priority in competing for State contracts worth up to €16 billion a year. This and further initiatives are in place, so as to reduce greenhouse gas emissions by up to 20% by the year 2020.By the end of 2018 the public sector must own or rent only buildings with high energy-saving standards and …


Implementing Building Information Modeling In Public Works Projects In Ireland, Barry Mcauley, Alan V. Hore, Roger West Jul 2012

Implementing Building Information Modeling In Public Works Projects In Ireland, Barry Mcauley, Alan V. Hore, Roger West

Conference papers

The Irish State in recent years has suffered huge financial losses in the public works sector, which has now pushed the Irish Government to explore new ways of controlling cost. This background lead to the introduction of the Capital Works Management Framework in 2007 which aimed to support the certainty of outcome in terms of cost and quality, as well as improved risk management, through the implementation of fixed price contracts. In order to successfully compete within this framework it is recommended by the authors, that Irish Government moves towards the legal mandating of BIM. This can ensure a greater …


Life Cycle Cost Analysis Under Ireland's Capital Works Management Framework, Dermot Kehily, Alan Hore Jan 2012

Life Cycle Cost Analysis Under Ireland's Capital Works Management Framework, Dermot Kehily, Alan Hore

Conference papers

The Capital Works Management Framework (CWMF) is a structure that has been developed to deliver the Irish government’s objectives in relation to public sector construction procurement reform. This research provides practical guidance and assistance for construction cost professionals in carrying out Whole Life Cycle Cost Analysis (WLCCA) and producing Life Cycle Cost Models(LCCMs) under the CWMF. The research outlines how LCCA calculations can be carried out for cost planning purposes and recommends a standard methodology for presenting LCCMs under the CWMF. The CWMF states that Whole Life Costs (WLC) are an important consideration throughout the design process and should be …