Open Access. Powered by Scholars. Published by Universities.®

Architecture Commons

Open Access. Powered by Scholars. Published by Universities.®

Series

Business Administration, Management, and Operations

Institution
Keyword
Publication Year
Publication

Articles 1 - 30 of 55

Full-Text Articles in Architecture

Early Supplier Involvement Framework For Reducing Construction Waste During The Design Process, Ayman Ahmed Ezzat Othman, Yomna Abdelghany El-Saeidy Jan 2022

Early Supplier Involvement Framework For Reducing Construction Waste During The Design Process, Ayman Ahmed Ezzat Othman, Yomna Abdelghany El-Saeidy

Architectural Engineering

Purpose – The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design process. Design/methodology/approach – A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, the literature review was used to investigate CW, CW generated during the design process, the design process and ESI. Second, two construction projects were analysed to investigate the role of ESI towards reducing CW generated during the design waste. Third, a survey questionnaire was carried out with …


Ua3/1/1 President's Office-Cherry Reports, Wku Archives Jan 2021

Ua3/1/1 President's Office-Cherry Reports, Wku Archives

WKU Archives Collection Inventories

Reports made by Henry Cherry to the Board of Regents and departmental reports made to Henry Cherry.


Tesla Solar Roof Marketing Plan, Mustafa Almuzel, Touraj Goudarznia, Ali Daneshi, Mohammadsaleh Saadatmand, Mufeed Yacoub Jan 2018

Tesla Solar Roof Marketing Plan, Mustafa Almuzel, Touraj Goudarznia, Ali Daneshi, Mohammadsaleh Saadatmand, Mufeed Yacoub

Engineering and Technology Management Student Projects

This marketing plan for Tesla roof has been written to find the best marketing strategies for this new product. Tesla roof was launched in 2017 as part of Tesla’s mission to accelerate the transition of the world into sustainable energy. The objective is to position Tesla roof tile as the first choice for homeowners seeking aesthetics and green energy, gaining market share within three years. The research shows that positioning Tesla roof in the solar market would be the most suitable approach for Tesla. Research and customer interviews analysis implies that the value proposition for this solar roof would be …


What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan Nov 2017

What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan

Conference papers

There is an acceptance that BIM, via data management, can be integrated with FM to reduce costs during the Operations and Maintenance stage of a project. However, what has not been documented is the ‘on the ground’ reality which can be reviewed as a lessons learnt exercise to improve the implementation of BIM FM for future projects. This case study sets out to explore the realities of a client’s adoption of BIM based upon the actual experience of the Greenway Hub. Rather than relying on anecdotal evidence the research was based upon the real practices and experiences of the Dublin …


The Perception Of Knowledge Management System Implementation To Employee Performance Is Measured With Balanced Scorecard At Pt Vale Indonesia Tbk, Yeni Febriyani Apr 2016

The Perception Of Knowledge Management System Implementation To Employee Performance Is Measured With Balanced Scorecard At Pt Vale Indonesia Tbk, Yeni Febriyani

Masters Theses & Specialist Projects

Knowledge Management System (KMS) is a necessary concept as knowledge possessed by each individual employee is an intellectual property asset that will provide benefits for any organization. In a company, in terms of KMS, employees’ performance holds an important role in helping run the business of the company becoming sustainable and successful. Therefore, the measurement of employees’ performance based on a balanced scorecard is needed to understand the current business situation. This research helped focus on the perception between the KMS and employee’s performance based on a balanced scorecard (BSC) regarding a financial perspective, customer perspective, internal business process perspective, …


Becoming Sustainable In Our Own Way: Sustainability At The Flagship Massachusetts Public University, Ludmilla Pavlova-Gillham, Dennis Swinford Jan 2016

Becoming Sustainable In Our Own Way: Sustainability At The Flagship Massachusetts Public University, Ludmilla Pavlova-Gillham, Dennis Swinford

Campus Planning Community and Conference Presentations

This presentation was delivered at the 2016 World Symposium on Sustainable Development at Universities . It outlines a case study of the comprehensive sustainability efforts undertaken by the University of Massachusetts Amherst and evaluates its progress by applying Kotter’s 8-step approach to change management to multiple phases of the campus development efforts. Emphasis is placed on efforts to integrate sustainability goals with campus master planning, facility plans, green building policies, governance and educational and operations teaching and research initiatives. The presentation also outlines concrete steps for comprehensive physical planning that universities may consider as they integrate change management practices for …


Umass Amherst Campus Master Plan Sustainability Chapter, Ludmilla Pavlova-Gillham, Nariman Mostafavi, Mohamad Farzinmoghadam, Kylie A. Landrey, Somayeh Tabatabaee Pozveh, Ezra Small, Ted Mendoza, Jason J. Burbank, Robert Ryan, Dennis Swinford, Niels La Cour, Alexander Stepanov Jan 2015

Umass Amherst Campus Master Plan Sustainability Chapter, Ludmilla Pavlova-Gillham, Nariman Mostafavi, Mohamad Farzinmoghadam, Kylie A. Landrey, Somayeh Tabatabaee Pozveh, Ezra Small, Ted Mendoza, Jason J. Burbank, Robert Ryan, Dennis Swinford, Niels La Cour, Alexander Stepanov

Campus Planning Master Plans

The UMass Amherst Campus Master Plan Sustainability Chapter articulates the manner in which the Campus Master Plan 2012 principles translate into specific recommendations for campus systems development in support of future smart growth. It summarizes the current physical campus-scale planning projects that Facilities & Campus Services have completed during and after the Master Plan process, and incorporates other operational and educational initiatives that have engaged our campus community as we plan for sustainability.

The CMP Chapter is organized in three major sections: i) sustainability overview; ii) campus master plan systems; iii) current initiatives; and iv) next steps. The first section …


How Kaizen Group Leader Selection Affects Group Participation, M. Joleen Byerline Aug 2013

How Kaizen Group Leader Selection Affects Group Participation, M. Joleen Byerline

Masters Theses & Specialist Projects

Organizational communication research indicates group member participation increases as the legitimate power differences among group members decreases. Lean principles and practices indicate Kaizen Event members will contribute regardless of legitimate power levels, due to member training, education, and the Lean team-oriented culture. Further study is needed to determine if Lean culture and training maximize group member contribution, or if legitimate power levels in Lean environments manipulate participation. The focus of this case study is a central Kentucky Lean manufacturing organization that practiced Lean principles for at least three years and completed a Kaizen Event within twelve months previous to the …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2013, Margaret N. Rees Jan 2013

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2013, Margaret N. Rees

Walking Box Ranch

  • BLM notified UNLV on Nov 7, 2012 that they had cancelled the WBR solicitation for a general contractor and that they were reconsidering the scope of the project. BLM and UNLV met on Nov. 22, 2012 and BLM updated UNLV on their decision to terminate the task agreement for the field and research station, and to modify plans for interpretation at the future WBR Visitor Center. BLM and UNLV will meet Feb. 7, 2013 to discuss the path forward regarding interpretation and the Visitor’s Center.
  • UNLV is continuing to work with direction from Carolyn Shelton, BLM interpreter, to collect interpretive …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending October 10, 2012, Margaret N. Rees Oct 2012

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending October 10, 2012, Margaret N. Rees

Walking Box Ranch

  • BLM and UNLV met with AECOM on 7/12/12 to review Walking Box Ranch (WBR) project progress, timing of posting of project bid documents, and the anticipated project calendar through December 2012.
  • BLM and UNLV met on 9/25/12 to update Mark Spencer, BLM’s new Field Manager for the Red Rock/Sloan Field Office, to brief him on UNLV participation at WBR, and to discuss the status of the operating agreement and major concerns that include timely completion of the operating agreement, which will allow completion of business plan and release of $500K for IT and security by UNLV’s president.
  • UNLV is continuing …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending July 10, 2012, Margaret N. Rees Jul 2012

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending July 10, 2012, Margaret N. Rees

Walking Box Ranch

  • BLM informed UNLV that after investigating a concession contract as the appropriate BLM document for the future operating partner, they have concluded that an operating agreement is the preferred document and they are proceeding to complete such an agreement as soon as possible.
  • Following a visit to the ranch with BLM, UNLV has completed temporary repairs to ranch house windows, which should mitigate deterioration of the ranch house from water
  • UNLV participated in a one-half day meeting with BLM to review Condit’s Extended Content Package #1. As a result of the lack of progress by Condit, UNLV was requested to …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending April 10, 2012, Margaret N. Rees Apr 2012

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending April 10, 2012, Margaret N. Rees

Walking Box Ranch

  • BLM informed UNLV that the type of operating plan that was identified in June, 2011 as the appropriate instrument for future operations, and which was to have been completed by May 2012, prior to beginning construction, would not work for BLM. BLM informed UNLV that they are now considering a concession contract as the appropriate BLM document for the future operating partner.
  • BLM and UNLV visited the ranch for a day to examine the continuing deterioration of the ranch house from water, and to discuss how to address this on-going problem. The group reviewed damage owing to water coming into …


Art And Space: Impacting The Workplace, Erin V. Mccool Apr 2012

Art And Space: Impacting The Workplace, Erin V. Mccool

Senior Honors Theses

Art in its various forms and applications has always been a part of the human experience. Art can be intrusive, thought provoking, or simply beautiful. Although art comes in many different styles and forms, art continues to capture our imagination. The purposes of this thesis are to discover how art affects human activity in the workplace as well as the qualities that make artwork in the workplace successful. Based on the findings of this study, artwork will be created for the Center for the Advancement of Faculty Excellence at Liberty University in order to create a lively, creative environment. By …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2012, Margaret N. Rees Jan 2012

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2012, Margaret N. Rees

Walking Box Ranch

  • UNLV’s President Smatresk has reiterated his commitment to the WBR project and has further committed full funding for IT and security costs.
  • UNLV participated in a one-half day meeting with BLM to discuss the future WBR operating agreement between BLM and UNLV; UNLV participated in a 1.5 day meeting to review the 100% Design drawings.
  • UNLV continues to wait on BLM for direction on how to mitigate the continuing deterioration of the ranch house.
  • Weather station research continues and has produced the following this past quarter. 1) Ground-source heat pump (GSHP) Vs Photovoltaic (PV) technology: A detailed analysis comparing these …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending October 10, 2011, Margaret N. Rees Oct 2011

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending October 10, 2011, Margaret N. Rees

Walking Box Ranch

  • UNLV participated in two meetings with BLM regarding updating the current Task Order, obtaining a two-year no-cost extension for the two Assistance Agreements, and to develop the future WBR operating agreement between BLM and UNLV.
  • Weather station progress included: 1) A study to review the recent developments in various building envelope components and their effects on the energy sustainability of a building has been completed and published, 2) Ground-source heat pump (GSHP) Vs Photovoltaic (PV) technology: A detailed comparison of ground source heat pumps and photo voltaics has been initiated, 3) A study to identify the most suitable and economically …


Ua3/9/2 Section Ii: Market Area Review & Site Description, Proposed Hotel At Wku, Wku President's Office - Ransdell Aug 2011

Ua3/9/2 Section Ii: Market Area Review & Site Description, Proposed Hotel At Wku, Wku President's Office - Ransdell

WKU Archives Records

Section II: Marketing Area Review & Site Description for proposed hotel at WKU of PKF Consulting firm report. This copy is annotated.


Ua3/9/2 Market Demand Study & Statement Of Estimated Annual Operating Results, Wku President's Office - Ransdell Aug 2011

Ua3/9/2 Market Demand Study & Statement Of Estimated Annual Operating Results, Wku President's Office - Ransdell

WKU Archives Records

Marketing report created by PKF Consulting firm regarding the tax increment financing district of Bowling Green.


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending July 10, 2010, Margaret N. Rees Jul 2011

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending July 10, 2010, Margaret N. Rees

Walking Box Ranch

  • UNLV participated in several meetings with BLM regarding updating the current Task Order, obtaining a two-year no-cost extension for the two Assistance Agreements, and to develop the future WBR operating agreement between BLM and UNLV
  • UNLV met with Sara Moffatt, one of Senator Reid’s staff, to provide an update on project progress. UNLV also requested the Senator’s support in obtaining additional funding for the project for construction, and also for UNLV to bridge the transition from construction through the first two years of operation.
  • UNLV held several internal meetings to advance planning for a July VA meeting with BLM to …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending April 10, 2011, Margaret N. Rees Apr 2011

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending April 10, 2011, Margaret N. Rees

Walking Box Ranch

  • UNLV participated in the two-day 65% Design Development project meeting and assisted in planning and design of the future WBR museum and field/research station.
  • UNLV held several internal meetings to advance planning for IT and security at the ranch.
  • UNLV (Cline) and BLM (McAboy) have begun a series of meetings regarding updating the current Task Order, requesting a two-year no-cost extension for the two Assistance Agreements, and to develop a concept plan for the future WBR operating agreement between BLM and UNLV.
  • Weather station progress included adding a Pyrheliometer that measures solar radiation received to the station. Progress was made …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2011, Margaret N. Rees Jan 2011

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2011, Margaret N. Rees

Walking Box Ranch

  • UNLV participated in three project workshops and one additional meeting to assist in planning and design of the future WBR museum and field/research station.
  • Weather station progress included design of programming software that will provide past weather information to website user, two abstracts have been submitted to an energy sustainability meeting, and a paper reviewing energy efficient building envelope components has been prepared and submitted for publication.
  • Work has begun on a new education project titled “Multimedia Field Guides for Public Engagement at Walking Box Ranch, Mojave Desert.” The project will develop and disseminate a modern geological and environmental field …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending October 10, 2010, Margaret N. Rees Oct 2010

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending October 10, 2010, Margaret N. Rees

Walking Box Ranch

  • UNLV Public Safety is assisting in identifying security methods needed to guarantee safety and security at the ranch after project completion. This effort will involve the assistance of Metro CPTED program officers as design proceeds.
  • UNLV IT is determining the extent to which they can assist with networking and technology issues as project design moves forward. They may assist in identifying consultants to hire to assist with technology.
  • We have solicited research/education proposals from UNLV faculty for projects to be initiated in the coming year. The goal is to provide seed funding for projects that will expand as the facilities …


Unlv Magazine, Tony Allen, Shane Bevell, Donna Mcaleer, Ched Whitney, Cate Weeks Oct 2010

Unlv Magazine, Tony Allen, Shane Bevell, Donna Mcaleer, Ched Whitney, Cate Weeks

UNLV Magazine

No abstract provided.


Construction Cost Models, Barry Dikeman Aug 2010

Construction Cost Models, Barry Dikeman

Economics and Finance

The following are a series of cost estimate models similar in format to a typical engineer’s estimate that were developed in support of our financial impact assessment report for LD 1725. The models us current material costs, labor costs, and equipment costs for the region to provide a comparative cost analysis of seven culvert replacement scenarios. The models provide information about what the cost impact of LD 1725 would be for typical culvert replacements in Maine. However, due to the inherent restrictions of the cost modeling framework we were not able to include the abundance of variables that would be …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending June 10, 2010, Margaret N. Rees Jun 2010

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending June 10, 2010, Margaret N. Rees

Walking Box Ranch

  • UNLV has purchased weather equipment, established a weather station at the ranch, and has begun collecting weather data and conducting preliminary research. The station collects hourly data on temperature, humidity, wind speed and direction, and insolation that is transmitted wirelessly to UNLV and captured and projected on the PLI WBR website. A database of weather information will be maintained for further analysis. Research quantifying solar insolation at the ranch will be conducted.
  • UNLV has begun preparing informational brochures that will be available to the public at the ranch in the future and will provide information on biology, geology, anthropology, and …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending April 10, 2010, Margaret N. Rees Apr 2010

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending April 10, 2010, Margaret N. Rees

Walking Box Ranch

  • UNLV and Dornbusch and Associates have signed a contract for Dornbusch to conduct a “Visitor Services Feasibility, Compatibility, Market Study, and Business Plan” at the ranch, including all future museum and research center activities. This effort is kicking off in April 2010.
  • UNLV is in the process of purchasing and installing a weather station at the ranch, and will conduct preliminary research using this equipment. Funding for a dual axis solar tracker was obtained from the UNLV sustainability initiative.
  • Bill Wood, UNLV Real Estate Management, is continuing to work with Rex Bell to create an inventory of items that Rex …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2010, Margaret N. Rees Jan 2010

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2010, Margaret N. Rees

Walking Box Ranch

  • To advance educational and research goals at the ranch UNLV will fund the purchase and installation of a weather station at the ranch, and preliminary research using this equipment. PI Dr. Suresh Sardineni, Mechanical Engineering, will assess the renewable energy resources at the ranch and find methods to integrate them into existing and proposed new buildings at the site. The planned facilities will monitor beam and global solar radiation, wind speed and direction, temperature, and realative humidity. UNLV will provide funding to support two graduate students and partial salary for Dr. Sardineni.
  • Bill Wood, UNLV Real Estate Management, is working …


Do Companies Value Maintaining Iso 9000 Certification? 2009 Case Study Of 41 Us Companies First Certified In 2000, Sarah Joy Namara Nov 2009

Do Companies Value Maintaining Iso 9000 Certification? 2009 Case Study Of 41 Us Companies First Certified In 2000, Sarah Joy Namara

Masters Theses & Specialist Projects

The costs of obtaining and maintaining ISO certification are high. Moreover, studies have shown mixed results on the benefits of the certification. Consequently, the objective of this research was to verify whether or not companies do value maintaining the ISO 9000 certification.

The empirical study was conducted on 41 U.S. companies that were first certified in 2000. The companies formed an existing database as they were used by Dr. Arbuckle in 2004 in his doctoral dissertation. Of the 41 companies, 12 were found to be out of business, leaving a final sample size of 29. Data were gathered from this …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending October 10, 2009, Margaret N. Rees Oct 2009

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending October 10, 2009, Margaret N. Rees

Walking Box Ranch

  • UNLV has finalized a scope of work with Dornbusch and Associates to conduct a “Visitor Services Feasibility, Compatibility, Market Study, and Business Plan” and is now working with purchasing to sole source this contract.
  • UNLV is continuing to work with BLM and Viceroy Mining to obtain rhyolite from the Viceroy Castle Mountain deposit to use for building stone in the new construction.
  • UNLV submitted an EPSCoR proposal requesting ~$2.67M over three years to conduct sustainable energy research at WBR, which would include design and installation of green energy technologies.
  • UNLV is working with Condit to finalize the WBR brand.
  • UNLV …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending July 10, 2009, Margaret N. Rees Jul 2009

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending July 10, 2009, Margaret N. Rees

Walking Box Ranch

  • UNLV participated in the 100% Design Concept Plan meeting, June 10-12, 2009 at the BLM Las Vegas Field Office and Walking Box Ranch (WBR), and provided comments toward proposed concepts for the museum and field, research, and training center at Walking Box Ranch.
  • A request for funding for road construction and repair at WBR was submitted to NDOT (6/24/09).
  • UNLV participated in the following meetings related to the search for renewable energy funding for the ranch: ARRA Implementation Workshop sponsored by Senator Reid (4/16); UNLV Stimulus Funding Workshop (4/17), Renewable energy meeting with UNLV engineering faculty (4/21), Harry Reid Center …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending April 10, 2009, Margaret N. Rees Jan 2009

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending April 10, 2009, Margaret N. Rees

Walking Box Ranch

  • UNLV faculty and PLI scientists and interpreters participated in the 50% Design Concept Plan meeting, March 25-27 at UNLV-PLI and Walking Box Ranch (WBR), and provided comments toward proposed concepts for the museum and field, research, and training center at Walking Box Ranch.
  • UNLV is continuing to work with the Architectural Resources Group (ARG) under our SAT grant, to complete Master and Preservation Plans that will guide the SNPLMA-funded museum and field station projects now underway.
  • The National Historic Register nomination process, initiated under the SAT grant, was approved and WBR was placed on the NPS National Register of Historic …