Open Access. Powered by Scholars. Published by Universities.®

Architecture Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Architecture

What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan Nov 2017

What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan

Conference papers

There is an acceptance that BIM, via data management, can be integrated with FM to reduce costs during the Operations and Maintenance stage of a project. However, what has not been documented is the ‘on the ground’ reality which can be reviewed as a lessons learnt exercise to improve the implementation of BIM FM for future projects. This case study sets out to explore the realities of a client’s adoption of BIM based upon the actual experience of the Greenway Hub. Rather than relying on anecdotal evidence the research was based upon the real practices and experiences of the Dublin …


Linking Effective Whole Life Cycle Cost Data To Parametric Building Information Models Using Bim Technologies, Dermot Kehily, Trevor Woods, Fiacra P. Mcdonnell Nov 2013

Linking Effective Whole Life Cycle Cost Data To Parametric Building Information Models Using Bim Technologies, Dermot Kehily, Trevor Woods, Fiacra P. Mcdonnell

Conference papers

Abstract ̶ This paper demonstrates the capabilities of BIM (Building Information Modeling) in leveraging Whole Life Cycle Cost (WLCC) data requirements to perform WLCC calculations and produce WLLC estimates. The research determines the extent to which WLCC data, such as time, interest rates, escalation rates and real costs can be attached to parametric BIM data to be used effectively to create speedier and more accurate real-time WLLC analysis. Without incorporating WLCC data in the BIM, a complete picture of a construction project’s WLCC cannot be formed from the default outputs of the model. BIM 5D applications such as CostX utilise …