A Framework To Activate The Health And Safety Regulations In The Egyptian Construction Industry, Mostafa Adel Elsebaei, Ayman Ahmed Ezzat Othman, Omar Elnawawy, Mohammed Badawy
A Framework To Activate The Health And Safety Regulations In The Egyptian Construction Industry, Mostafa Adel Elsebaei, Ayman Ahmed Ezzat Othman, Omar Elnawawy, Mohammed Badawy
Architectural Engineering
Purpose
The construction industry is considered one of the most dangerous industries especially in developing countries such as Egypt. Although safety in Egypt is regulated by mainly four pivotal legislations, namely, Law No. 12 (2003) and Ministerial Decrees No. 211, 126 and 134, construction accident records in Egypt are high. Accordingly, this paper aims to develop a framework to activate the health and safety regulations in the Egyptian construction industry.
Design/methodology/approach
To achieve this aim, a research methodology consisting of a literature review and a survey questionnaire was developed to accomplish three objectives. First, a literature review was used to …
A Framework For Implementing Integrated Project Delivery In Architecture Design Firms In Egypt, Ayman Ahmed Ezzat Othman, Lamis Yasser Wagih Youssef
A Framework For Implementing Integrated Project Delivery In Architecture Design Firms In Egypt, Ayman Ahmed Ezzat Othman, Lamis Yasser Wagih Youssef
Architectural Engineering
Purpose
This paper aims to develop a framework for implementing the integrated project delivery (IPD) approach during the design process in architecture design firms (ADFs) in Egypt.
Design/methodology/approach
A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, literature review was used to identify and categorise the challenges of implementing IPD during the design process. Second, four case studies were analysed to investigate the values delivered to the client or missed due to the use of IPD or traditional procurement approaches, respectively. Finally, a survey questionnaire was carried out with …