Open Access. Powered by Scholars. Published by Universities.®

Architecture Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 6 of 6

Full-Text Articles in Architecture

Centres Of Excellence And Roadmaps For Digital Transition: Lessons For Ireland’S Construction Industry, Barry Mcauley, Alan Hore, Roger West Sep 2019

Centres Of Excellence And Roadmaps For Digital Transition: Lessons For Ireland’S Construction Industry, Barry Mcauley, Alan Hore, Roger West

Conference papers

Like most sectors in today’s working world, construction businesses are challenged to work in an increasingly digitised world with sophisticated demands from intelligent clients. So much has been written about the inefficiencies of the construction industry, its fragmentation, lack of collaboration, low margins, adversarial pricing, poor productivity, financial fragility, lack of research and development, poor industry image and relatively weak use of digital solutions. The Irish government recognises the importance of digital innovation to address many of the challenges the construction industry faces. With recent high profile reports of escalating spend on signature public sector projects and weak productivity performance …


Increasing Efficiency In 5d Bim By Utilising ‘Bim Interoperability Tools – Classification Manager’ To Append Icms Cost Codes, Dermot Kehily, Charles Anthony Mitchell Sep 2019

Increasing Efficiency In 5d Bim By Utilising ‘Bim Interoperability Tools – Classification Manager’ To Append Icms Cost Codes, Dermot Kehily, Charles Anthony Mitchell

Conference papers

Abstract ̶ This paper discusses Building Information Modelling (BIM), notably the 5th Dimension of BIM, which covers cost management functionality in the BIM workflow. The research proposes an efficient digitised workflow that can facilitate the appendage of an International Quantity Surveying (QS) Cost Code to a consistent parameter in the objects of the model. This paper firstly outlines how QSs are currently inserting ‘user defined’ information by adding their cost Work Breakdown Structure (WBS) to an existing parameter, such as the ‘keynote’ or ‘assembly code’. The QS also has the ability to create a QS specific parameter (QS IDentification), by …


Development Of A Framework To Support The Effective Adoption Of Bim In The Public Sector: Lessons For Ireland, Shiyao Kuang, Alan Hore, Barry Mcauley, Roger West Jun 2019

Development Of A Framework To Support The Effective Adoption Of Bim In The Public Sector: Lessons For Ireland, Shiyao Kuang, Alan Hore, Barry Mcauley, Roger West

Conference papers

Building Information Modelling (BIM) has been formally adopted by many countries with the promise of creating greater economic, social and sustainability benefits. Several authors and institutions have presented alternative BIM policies and tactics which have been adopted by developed countries. However, there is evidence to indicate that BIM adoption theories are not well established and, in particular, the linkage between BIM public sector adoption strategy outcomes and their contribution to achieving Government policy objectives are underdeveloped. This paper will present the outcome of the first phase of a systematic literature review of published studies (including journal papers and noteworthy international …


Incentivising Multidisciplinary Teams With New Methods Of Procurement Using Bim + Blockchain​, Alan O'Reilly, Malachy Mathews May 2019

Incentivising Multidisciplinary Teams With New Methods Of Procurement Using Bim + Blockchain​, Alan O'Reilly, Malachy Mathews

Conference papers

This paper researches a potential method of incentivising AEC industry professionals to design to better than NZEB standards. Analysing the potential of a purposefully designed local microgrid storing excess energy generated by solar technologies embedded within the building envelope; the microgrid excess output is measured and recorded using a (Post Occupancy) “Blockchain” application and measured against the data provided at design stage on a (Predictive) “Blockchain” database. This paper researches how energy output predictions at design stage, by multidisciplinary teams, may be enhanced by BIM + Blockchain Technology. The paper researches the potential of a digital twin (predictive versus post …


Automated Generation Of Daily Evacuation Paths In 4d Bim, Kyungki Kim, Yong-Cheol Lee Apr 2019

Automated Generation Of Daily Evacuation Paths In 4d Bim, Kyungki Kim, Yong-Cheol Lee

Durham School of Architectural Engineering and Construction: Faculty Publications

Spatial movements of workers and equipment should be carefully planned according to project plans. In particular, it is crucial for workers’ safety to prepare emergency evacuation paths according to changing construction site configurations and construction progress. However, creating evacuation paths for all crews for each day can be an extremely labor-intensive task if it is done manually. Consequently, in most construction projects, evacuation plans are not provided to managers and crews throughout the entire construction. Even state-of-the-art technologies do not suggest ways to generate evacuation paths according to changing progresses presented in 4-Dimensional Building Information Model (4D BIM). This research …


What Is A Bim Design Model?, James Peters, Malachy Mathews Jan 2019

What Is A Bim Design Model?, James Peters, Malachy Mathews

Conference papers

The recent report into Building Information Management or BIM, by construction law experts May Winfield and Sarah Rock entitled “Winfield Rock Report” [1] gives reason to state that the UK architectural, engineering and construction industry or AEC, is hindered by the absence of a clear definition of Level 2 BIM. The ISO 19650-2 standard published in 2019, is based upon PAS1192-2:2013. The intent of ISO 19650-2 is to provide a road map to facilitate the standardisation of BIM process in a uniformed fashion. A key pillar of ISO 19650 is the “information cycle” and central to this is a federated …