Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 1 of 1
Full-Text Articles in Architecture
Racetrack Engineered Surface Project Initial Study And Mitigated Negative Declaration, Christina M. Keller
Racetrack Engineered Surface Project Initial Study And Mitigated Negative Declaration, Christina M. Keller
Master's Theses
The Professional Project addressed here is an Initial Study/Mitigated Negative Declaration for a project proposed by the staff of the Del Mar Fairgrounds pursuant to legal mandate by the State of California Horse Racing Board.
The “Project” subject to documentation under CEQA consisted of removal of the top seven inches of the existing dirt surface on the Del Mar Fairgrounds horse racing track and temporary storage of the material on the practice track infield; installation of a new drainage system, rock filtration system, permeable asphalt layers, and seven inches of engineered surface material; widening of the track in the northeast …