Open Access. Powered by Scholars. Published by Universities.®

Architecture Commons

Open Access. Powered by Scholars. Published by Universities.®

Ecology and Evolutionary Biology

Series

Institution
Keyword
Publication Year
Publication

Articles 1 - 28 of 28

Full-Text Articles in Architecture

Rethinking Human-Local Wildlife Relations, Yin Chan May 2022

Rethinking Human-Local Wildlife Relations, Yin Chan

Critical and Creative Thinking Capstones Collection

The plight of suburban wildlife receives considerably less attention than that of exotic or endangered species despite facing similar threats due to the decline of their natural habitats as humans expand upon them. From the perspective of a reflective practitioner, this paper provides new avenues to rethink current views on human-local wildlife relations and answer some of the difficult questions surrounding the topic. The methodology of Action Research is employed to explore concepts relevant to human-local wildlife relations. A synthesized practical framework integrating Action Research with Permaculture Design is proposed to create models for mutually beneficial coexistence between local wildlife …


Contaminated Mycoscapes: Designing With Living Organisms, Maria Gutierrez, Elise Zilius May 2021

Contaminated Mycoscapes: Designing With Living Organisms, Maria Gutierrez, Elise Zilius

Architecture Senior Theses

The Anthropocene has stripped the planet of its resources, leaving behind an abundance of contamination. The built environment no longer meets the standards set by our turbulent planet. Humankind has lost the privilege of agency in design and construction. Construction methods have failed to evolve concurrently to the intense accumulation of waste; remaining firmly rooted in the materiality of the past, they have upheld architectural notions of stagnancy, cleanliness, and hygiene and ignore the rapidly changing conditions of the environment. This investigation uses contamination to fuel mycelial growth and construct emergent forms whilst executing remediation strategies for polluted sites of …


Nine-Mile Prairie Environs: Master Plan, April 2020, Center For Grassland Studies Apr 2020

Nine-Mile Prairie Environs: Master Plan, April 2020, Center For Grassland Studies

Center for Grassland Studies: Newsletters

A red and white checkered water tower stands atop the hills on Lincoln’s northwest fringe. The tower sustains water pressure and is a waypoint finder for air traffic approaching the Lincoln airfield. In addition to these services, the tower’s checker pattern can symbolize the surrounding patchwork of native unplowed tallgrass prairie that comprises the Nine-Mile Prairie (NMP) Environs. At the core is NMP, a 230-acre public property full of tallgrass prairie biodiversity and Nebraska history. An area surrounding NMP, referred to as the “Environs” in the context of this strategic planning document, is almost entirely grassland or agricultural cropland. The …


How Useful Is Gsv As An Environmental Observation Tool? An Analysis Of The Evidence So Far., Katherine Nesse, Leah Airt Oct 2017

How Useful Is Gsv As An Environmental Observation Tool? An Analysis Of The Evidence So Far., Katherine Nesse, Leah Airt

SPU Works

Researchers in many disciplines have turned to Google Street View to replace pedestrian- or carbased in-person observation of streetscapes. It is most prevalent within the research literature on the relationship between neighborhood environments and public health but has been used as diverse as disaster recovery, ecology and wildlife habitat, and urban design. Evaluations of the tool have found that the results of GSV-based observation are similar to the results from in-person observation although the similarity depends on the type of characteristic being observed. Larger, permanent and discrete features showed more consistency between the two methods and smaller, transient and judgmental …


Arcata Marsh History: Union Wharf, Mad River Canal, Reclamation, Lumber Mills, City Designs, Susie Van Kirk Feb 2015

Arcata Marsh History: Union Wharf, Mad River Canal, Reclamation, Lumber Mills, City Designs, Susie Van Kirk

Susie Van Kirk Papers

A report of the Arcata Marsh including information about Wiyot residents, white settlement, the Union Wharf, the Mad River Canal, the abandoned wharf, reclamation, lumber mills, and city designs. Includes many maps and photographs.


Issue Brief: Asset Management For Stormwater, New England Environmental Finance Center, Sustainable Communities Learning Network Apr 2014

Issue Brief: Asset Management For Stormwater, New England Environmental Finance Center, Sustainable Communities Learning Network

Sustainable Communities Capacity Building

Asset management is a strategic approach to maintaining and sustaining infrastructure in order to meet the needs of the community at the lowest overall life cycle cost. This approach helps communities know how and where to prioritize limited funds in order to achieve the greatest benefit. Often applied to drinking water and wastewater infrastructure, this method is well suited to managing any assets, including stormwater systems.

This issue brief is intended to introduce local governments to the asset management process and to show how it can be applied in managing stormwater assets. It was adapted from an appendix written by …


Brief Analysis Of The Tan Brook Watershed In Amherst, Massachusetts, Andrew Mckenna, Robert F. Smith Jan 2014

Brief Analysis Of The Tan Brook Watershed In Amherst, Massachusetts, Andrew Mckenna, Robert F. Smith

Research

The Tan Brook is a small 3.91 square kilometer watershed that runs through and encompasses the highly urbanized areas of Amherst, MA. It is part of the Connecticut River basin and the Mill River sub-basin. In order to meet the high demands of the local middle and high school, and heavy runoff from high amounts of impervious cover from downtown Amherst and the University of Massachusetts, the Tan Brook has been highly culverted.


The Environmental Condition Of Tan Brook And Campus Pond, A Community And University Concern, Marita Clay, Robert F. Smith Jan 2014

The Environmental Condition Of Tan Brook And Campus Pond, A Community And University Concern, Marita Clay, Robert F. Smith

Research

Small streams have the unfortunate ability to be greatly impacted by human intervention. Civilizations for centuries have attempted to alter the natural state of their environment, and Amherst's own Tan Brook is a local example of the consequences of human alterations on a stream. The brook flows over and under what many local citizens call home, and where many UMass students go to learn. A healthier Tan Brook would be expected to provide for improvement of ecosystem services such as flood control and nutrient processing, resulting in a cleaner campus pond and a better connection between the stream and the …


Qualitative And Comparative Analysis Of Stormwater Management In The Tan Brook Watershed, Natalia Von Hausen, Robert F. Smith Jan 2014

Qualitative And Comparative Analysis Of Stormwater Management In The Tan Brook Watershed, Natalia Von Hausen, Robert F. Smith

Research

The Tan Brook Watershed is both a daylighted and diverted underground stream that runs through the Town Center of Amherst and the campus of UMass Amherst. Various stormwater management practices have been used to infiltrate stormwater runoff from streets, lots, buildings and/or vehicles. These systems are custom-designed relative to the surrounding permeability of the soil, vegetation and geographical topography. Some systems have higher success rates than others.


The Cost Of Green Infrastructure: Worth The Investment?, Martha Sheils Nov 2013

The Cost Of Green Infrastructure: Worth The Investment?, Martha Sheils

Green Infrastructure

Is GI worth the investment?

• LID techniques often lead to cost savings when we look at WHOLE PROJECT COSTS

• Natural Infrastructure investments for flood control, drinking water protection and wildlife habitat can yield SIGNIFICANT AVOIDED COSTS and additional co-benefits to communitites


Custodianship Of The Walking Box Ranch Property: Project Compendium, Margaret N. Rees Sep 2013

Custodianship Of The Walking Box Ranch Property: Project Compendium, Margaret N. Rees

Walking Box Ranch

This Project Compendium contains information and products resulting from a multi-year cooperative effort between the Bureau of Land Management (BLM) Las Vegas Field Office and University of Nevada, Las Vegas (UNLV) to care for and make available a BLM-owned Southern Nevada historic property: Walking Box Ranch. This project was focused, primarily, on the custodianship of the site through UNLV’s design, management, and coordination of a resident caretaker program, which was carried out by a series of excellent volunteers. University experts contributed to the decision-making process for necessary repairs and site security was enhanced through an innovative volunteer project open to …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2013, Margaret N. Rees Jan 2013

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2013, Margaret N. Rees

Walking Box Ranch

  • BLM notified UNLV on Nov 7, 2012 that they had cancelled the WBR solicitation for a general contractor and that they were reconsidering the scope of the project. BLM and UNLV met on Nov. 22, 2012 and BLM updated UNLV on their decision to terminate the task agreement for the field and research station, and to modify plans for interpretation at the future WBR Visitor Center. BLM and UNLV will meet Feb. 7, 2013 to discuss the path forward regarding interpretation and the Visitor’s Center.
  • UNLV is continuing to work with direction from Carolyn Shelton, BLM interpreter, to collect interpretive …


Developing A Restorable Wetland Index For Rainwater Basin Wetlands In South-Central Nebraska: A Multi-Criteria Spatial Analysis, Zhenghong Tang, Xu Li, Nan Zhao, Ruopu Li, F. Edwin Harvey Oct 2012

Developing A Restorable Wetland Index For Rainwater Basin Wetlands In South-Central Nebraska: A Multi-Criteria Spatial Analysis, Zhenghong Tang, Xu Li, Nan Zhao, Ruopu Li, F. Edwin Harvey

Community and Regional Planning Program: Faculty Scholarly and Creative Activity

It is always challenging for decision makers to prioritize wetland conservation programs at the landscape scale. This study employed a GIS-based multi-criteria spatial decision support tool that identified locations with the highest restoration potential for wetland conservation programs in the Rainwater Basin in south-central Nebraska. Five indicators were considered to assess wetland restoration potential: (1) Vegetation characteristics; (2) Soil characteristics; (3) Water volume released from hydrological modification of agricultural irrigation pits; (4) Topographical depression status; and (5) Habitat condition. The results suggested 192 (1.6% of the total) hydric soil footprints as the highest prioritized locations for future wetland restoration programs. …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending July 10, 2012, Margaret N. Rees Jul 2012

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending July 10, 2012, Margaret N. Rees

Walking Box Ranch

  • BLM informed UNLV that after investigating a concession contract as the appropriate BLM document for the future operating partner, they have concluded that an operating agreement is the preferred document and they are proceeding to complete such an agreement as soon as possible.
  • Following a visit to the ranch with BLM, UNLV has completed temporary repairs to ranch house windows, which should mitigate deterioration of the ranch house from water
  • UNLV participated in a one-half day meeting with BLM to review Condit’s Extended Content Package #1. As a result of the lack of progress by Condit, UNLV was requested to …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending July 10, 2010, Margaret N. Rees Jul 2011

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending July 10, 2010, Margaret N. Rees

Walking Box Ranch

  • UNLV participated in several meetings with BLM regarding updating the current Task Order, obtaining a two-year no-cost extension for the two Assistance Agreements, and to develop the future WBR operating agreement between BLM and UNLV
  • UNLV met with Sara Moffatt, one of Senator Reid’s staff, to provide an update on project progress. UNLV also requested the Senator’s support in obtaining additional funding for the project for construction, and also for UNLV to bridge the transition from construction through the first two years of operation.
  • UNLV held several internal meetings to advance planning for a July VA meeting with BLM to …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2011, Margaret N. Rees Jan 2011

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2011, Margaret N. Rees

Walking Box Ranch

  • UNLV participated in three project workshops and one additional meeting to assist in planning and design of the future WBR museum and field/research station.
  • Weather station progress included design of programming software that will provide past weather information to website user, two abstracts have been submitted to an energy sustainability meeting, and a paper reviewing energy efficient building envelope components has been prepared and submitted for publication.
  • Work has begun on a new education project titled “Multimedia Field Guides for Public Engagement at Walking Box Ranch, Mojave Desert.” The project will develop and disseminate a modern geological and environmental field …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending October 10, 2010, Margaret N. Rees Oct 2010

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending October 10, 2010, Margaret N. Rees

Walking Box Ranch

  • UNLV Public Safety is assisting in identifying security methods needed to guarantee safety and security at the ranch after project completion. This effort will involve the assistance of Metro CPTED program officers as design proceeds.
  • UNLV IT is determining the extent to which they can assist with networking and technology issues as project design moves forward. They may assist in identifying consultants to hire to assist with technology.
  • We have solicited research/education proposals from UNLV faculty for projects to be initiated in the coming year. The goal is to provide seed funding for projects that will expand as the facilities …


The Very Basics Of Sustainability - An Alternative Viewpoint (Slides With Audio) (Large File! To Speed Up Download, Right-Click On "Download" Link To Save To Own Pc.), Jim Mcgovern Aug 2009

The Very Basics Of Sustainability - An Alternative Viewpoint (Slides With Audio) (Large File! To Speed Up Download, Right-Click On "Download" Link To Save To Own Pc.), Jim Mcgovern

Other resources

This presentation sets out the very basics of ‘sustainability’, although a definition of sustainability is not attempted. Some of the very basics are the context in which the Earth and humankind exist in space and time, the Earth’s climate, the Earth’s population and humankind’s options and choices. The author advocates keeping an open mind on all available options, including the use of oil, gas, coal, tar sands, carbon capture and sequestration, nuclear power etc., as well as the technologies that are more widely considered ‘green’. The author also argues that, in addressing the challenges that humankind faces, globally concerted effort …


Red Rock Desert Learning Center & Wild Horse And Burro Facility: Sketches Of Planned Facilities, Red Rock Desert Learning Center Jan 2006

Red Rock Desert Learning Center & Wild Horse And Burro Facility: Sketches Of Planned Facilities, Red Rock Desert Learning Center

Oliver Ranch Project

Sketches of planned facilities


Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England

Dickey-Lincoln School Lakes Project

The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on the St.John River. The combination hydroelectric power and flood control project is located in Aroostook County, Maine, near the Canadian border. The two proposed earth fill dams located at Dickey are 10,200 feet in length with a maximum height of 335 feet. They would impound 7.7 million acre feet of water at a maximum pool elevation 910 feet mean sea level. A second earth filled dam located 11 miles downstream at Lincoln School would serve as a regulatory dam. It would be 2100 feet in lenqth, …


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route, and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, documenting an early phase of the overall studies, was first published by the Department of the Interior in February 1977. It is being republished as Appendix A to the DOE Environmental Impact Statement for the project.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The principal objective of this study is to identify the major types and intensity of social and economic impacts anticipated with the proposed pre-construction, construction, operation and maintenance of the Dickey-Lincoln transmission line. In order to address the types of anticipated impacts it was necessary to first develop a socio-economic profile of the affected area.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, one of several prepared under contract to the DOE by various consultants, is published as an appendix to that statement. Appendix F, Geotechnical Impact Study (two volumes, the second being a map volume), documents a study performed by E. C. …


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix G: Land Use Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix G: Land Use Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

This report is in partial fulfillment of the requirement of the National Environmental Policy Act of 1969. It is a study of the existing and proposed land use impacts which would likely occur as a result of construction of the Dickey-Lincoln Transmission Line in con-junction with the Dickey-Lincoln Hydroelectric Project at Lincoln School in Northern Maine. This report is organized and follows basically a topical summary as outlined in the National Environmental Policy Act.


Dickey-Lincoln School Lakes Project Environmental Impact Statement : Appendix G: Recreation Resources, Northern Maine Regional Planning Commission, Land Use Consultants, Inc., New England Division, U.S. Army Corps Of Engineers Jan 1977

Dickey-Lincoln School Lakes Project Environmental Impact Statement : Appendix G: Recreation Resources, Northern Maine Regional Planning Commission, Land Use Consultants, Inc., New England Division, U.S. Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

This report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. The primary impact area of the proposed project (project area) includes the St. John River watershed upstream of the proposed damsites to the confluence of Nine-mile Brook. The area is bounded by the watershed divide with the Allagash River on the east and the Canadian Border on the west.


Terrestrial Ecology Of The Dickey-Lincoln School Lakes Project, Corps Of Engineers, New England Division, Environmental Research & Technology, Inc Jan 1976

Terrestrial Ecology Of The Dickey-Lincoln School Lakes Project, Corps Of Engineers, New England Division, Environmental Research & Technology, Inc

Dickey-Lincoln School Lakes Project

This introduction of the St. John River watershed is situated in a transitional zone between the Boreal Forest Formation and the Eastern Deciduous Forest Formation. Second-growth forests representative of these two ecosystems cover extensive areas of the project site. The boreal forest forms a broad transcontinental belt in northern North America and Eurasia, with southern montane extensions. This northern forest is characterized by evergreen, coniferous trees, predominately spruce-fir The eastern deciduous forest, composed of broad-leaved hardwoods, extends throughout the eastern United States except Florida (Dasmann, 1968; Oosting, 1956).


Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers Jan 1976

Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers

Dickey-Lincoln School Lakes Project

The first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of the Dickey and Lincoln …


Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers Jan 1975

Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

Revised draft combines data previously published in two separate impact statements prepared by the corps relating to the dams, reservoirs and power plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid. The latter agency is responsible for the marketing and distribution of power generated at federally-financed installations.