Open Access. Powered by Scholars. Published by Universities.®

Architecture Commons

Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering and Management

2014

As-built schedule

Articles 1 - 1 of 1

Full-Text Articles in Architecture

Dwr Based As-Built Schedule –Powerful But Highly Neglected Application Of Dwr Data, Joseph Shrestha, H. David Jeong Dec 2013

Dwr Based As-Built Schedule –Powerful But Highly Neglected Application Of Dwr Data, Joseph Shrestha, H. David Jeong

Joseph Shrestha

Daily work report (DWR) is a very important data recorded by the inspectors during the construction projects. Although, a lot of time and effort is invested to collect this big amount of DWR data, its use has been limited mostly to the contractor payment and dispute resolution. This study presents the methodological details about utilizing the historical DWR data to automatically generate the schedule for future projects based on the bid data. As a proof of concept of concept, as-built schedules has been developed from the DWR data. The as-built schedule generated can be used as a tool for more …