Open Access. Powered by Scholars. Published by Universities.®
- Keyword
-
- Construction (2)
- 2022 (1)
- CMU (1)
- Collaborative (1)
- Concrete (1)
-
- Connection Design (1)
- Cracking (1)
- Grout (1)
- Interdisciplinary (1)
- Masonry (1)
- Meditation (1)
- Modular (1)
- Modular House (1)
- Panel (1)
- Parametric Design (1)
- Poly Canyon (1)
- Prism Testing (1)
- Restoration (1)
- Restraint (1)
- Self-Consolidating Grout (1)
- Shell Structures (1)
- Shrinkage (1)
- Slump Flow Test (1)
- Tilt-up (1)
Articles 1 - 5 of 5
Full-Text Articles in Architecture
The Center For Centering Dome, Olek Piechaczek, Ryan M. Scharf
The Center For Centering Dome, Olek Piechaczek, Ryan M. Scharf
Architectural Engineering
The Center for Centering seeks to create a large-scale healing center, conducive to individual centering of the mind and body. This mobile installation provides a relaxing, enclosed space while still maintaining a connection to the outdoors. The clients liked the idea of having a pop-up installation that could be easily set up as a touring display. With a deadline for installation looming in June 2022, a team of students had five months to design and manufacture the structure.
In winter 2022, the students developed custom geometry to minimize the number of individual parts and built a ¼ scale model of …
Sage Garden Pavilion Shade Structure, Anthony Razouk Karroum, Manuel Bermudez, Matthew Kilbride, Sarah Holt, Marisa Martineau
Sage Garden Pavilion Shade Structure, Anthony Razouk Karroum, Manuel Bermudez, Matthew Kilbride, Sarah Holt, Marisa Martineau
Architectural Engineering
Form finding, testing, and construction of funicular double-layered shells in an interdisciplinary format with a focus on designing a shade structure for the San Luis Obispo Botanical Garden Children’s Pavilion. In the process, challenges such as connection design, materiality, storage, and more are explored and refined in relation to shell structures.
Investigation Of Grout - A Comparison Of Standard Grout Mix To Self-Consolidating Grout Mix, Rachel Garcia Chandler
Investigation Of Grout - A Comparison Of Standard Grout Mix To Self-Consolidating Grout Mix, Rachel Garcia Chandler
Architectural Engineering
Masonry is a major structural material for low rise buildings, however the design of masonry buildings is rarely taught as a formal course at most universities. As part of the educational experience and to become familiar with the specifications and testing procedures for grouted masonry, a student run experiment on varying the water to cement ratio of masonry grout was conducted. The purpose is to report on the effects of changing the water-to-cement (W/C) ratios in a standard grout mix. The typical W/C ratio is approximately 0.80:1.00. In order to show the effects of increasing water in a grout mix, …
Shrinkage Cracking In Concrete Tilt-Up Construction, Stewart Hooks, Jack Robinson
Shrinkage Cracking In Concrete Tilt-Up Construction, Stewart Hooks, Jack Robinson
Architectural Engineering
The purpose of this project is to investigate a particular, undesirable cracking pattern in concrete tilt-up panels that, until now, did not have a known definite cause. The cause of this cracking pattern is hypothesized to be due to shrinkage restraint of the concrete panels. The cracking under investigation occurs at the bottom corners of the Tilt-Up panels, suggesting that the base of the panel is restrained from shrinkage. This project models various components of Tilt-Up Construction that have potential for restraining the panels from shrinking. This project consists of the following main components.
The first aspect of this project …
Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer
Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer
Architectural Engineering
The Modular House, located in Poly Canyon, has seen extensive damage since the last caretaker left nearly ten years ago. To prevent further damage and improve the safety and appeal of the structure, we are proposing a renovation of the existing building that removes the existing cladding and partitions. By the end of Spring Quarter 2017, the Modular House will have a guardrail system replacing the wood paneling on the walls and a new steel composite deck to replace the current flooring system. The structural steel framing system will remain as is.