Systemic Rework Risk Classification For Offshore Projects, Peter Love, Jim Smith, Sangwon Han
Systemic Rework Risk Classification For Offshore Projects, Peter Love, Jim Smith, Sangwon Han
Jim Smith
Rework arises due to errors and omissions, and significantly contributes to project cost and schedule overruns in offshore projects. To acquire an understanding of the causal nature of rework in offshore projects, twenty three in-depth interviews with leading oil and gas industry practitioners were undertaken. The dialogue and narratives obtained from the interviews enabled the underlying dynamics of rework to be determined. A risk classification matrix is developed that can be utilized as a frame of reference to mitigate future rework. If rework risks are not given due consideration then there is the potential for latent conditions to become embedded …
Sensemaking Of Rework Causation In Offshore Structures: People, Organization And Project, Peter E. D. Love, Jim Smith, Sangwon Han
Sensemaking Of Rework Causation In Offshore Structures: People, Organization And Project, Peter E. D. Love, Jim Smith, Sangwon Han
Jim Smith
Cost and schedule overruns are norm in offshore hydrocarbon projects. With increasingly complex commercial and contracting arrangements, technical challenges, changing local economic and regulatory conditions and a shift toward project‘s being undertaken in peak oil frontier regions, the risks of overruns increase. A major factor contributing to such overruns is rework. Twenty three indepth interviews with leading oil and gas industry practitioners were undertaken to acquire knowledge of their experiences of rework causation in offshore projects. Analysis of the dialogue and narratives obtained enabled a nomenclature for rework causal factors to be classified as People, Organization and Project for different …