Open Access. Powered by Scholars. Published by Universities.®

Architecture Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 15 of 15

Full-Text Articles in Architecture

H & V News Nov 1981

H & V News

Building Services Engineering

No abstract provided.


H & V News Oct 1981

H & V News

Building Services Engineering

No abstract provided.


H & V News Sep 1981

H & V News

Building Services Engineering

No abstract provided.


H & V News Aug 1981

H & V News

Building Services Engineering

No abstract provided.


H & V News Jul 1981

H & V News

Building Services Engineering

No abstract provided.


H & V News Jun 1981

H & V News

Building Services Engineering

No abstract provided.


H & V News May 1981

H & V News

Building Services Engineering

No abstract provided.


H & V News Apr 1981

H & V News

Building Services Engineering

No abstract provided.


H & V News Mar 1981

H & V News

Building Services Engineering

No abstract provided.


H & V News Feb 1981

H & V News

Building Services Engineering

No abstract provided.


Dickey-Lincoln School Lakes Project Economic Analysis Study, New England Division, United States Army Engineer Division, Acres American Incorporated Jan 1981

Dickey-Lincoln School Lakes Project Economic Analysis Study, New England Division, United States Army Engineer Division, Acres American Incorporated

Dickey-Lincoln School Lakes Project

The purpose of this study was to perform an economic assessment of the Dickey-Lincoln School Lakes Project. This was accomplished by simulating the New England electrical supply system with and without the project and making a comparison of the resultant production costs.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Impact Statement, New England Division, United States Army Engineer Division Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Impact Statement, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

The Final Impact Statement is supported by all appendices from all drafts as well as supplementary information provided in Supplements to those Appendices. It comprises three volumes. Volume I is the statement volume. Volume II consists of two parts. Part I contains the comment and response portion of Section 9 for the 1977 Draft EIS. Part II contains comments and responses on the 1978 Revised Draft EIS, in addition to reproductions of the original comment letters received on the Draft Fish and Wildlife Mitigation Report and responses to these comments. Volume III, Part I contains reproductions of the original comment …


Dickey-Lincoln School Lakes Transmission Project: Final Environmental Impact Statement: Appendix L, New England Division, United States Army Corps Of Engineers, United States Department Of Energy Jan 1981

Dickey-Lincoln School Lakes Transmission Project: Final Environmental Impact Statement: Appendix L, New England Division, United States Army Corps Of Engineers, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft EIS Supplement describes the environmental impacts of updated transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Energy produced by the project is to be integrated into the New England electric system if the project is constructed.


H & V News Jan 1981

H & V News

Building Services Engineering

No abstract provided.


"The Church And Colonel Saunders": Mormon Standard Plan Architecture, Martha Sonntag Bradley Jan 1981

"The Church And Colonel Saunders": Mormon Standard Plan Architecture, Martha Sonntag Bradley

Theses and Dissertations

In the years 1920-80 the Mormon Church developed, expanded and refined an architectural program based on the concept of the standard plan. Standard plan buildings were selected, individualized and built for local ward units under the direction of the Church Building Department which created uniform standards of quality and appearance across the worldwide Church and created a tangible link between foreign members and the central Church.

Although functional and financial considerations directed virtually all design decisions and formed the operative basis of the program other elements also determined the nature of the Mormon approach to building. Growth, in the membership, …