Open Access. Powered by Scholars. Published by Universities.®
- Keyword
-
- Maine (3)
- Hydroelectric power plants (2)
- Water resources development (2)
- Dams (1)
- Dickey-Lincoln School Lakes (1)
-
- Electric lines (1)
- Electric power transmission (1)
- Energy policy (1)
- Environmental impact statements (1)
- Labor supply (1)
- New England (1)
- Recreation (1)
- Saint John River Valley (Me. and Québec) (1)
- Saint John River Watershed (ME and N.B.) (1)
- Saint John River Watershed (ME) (1)
- Saint John River Watershed (Me. and N.B.) (1)
- Transmission system planning study (1)
- Water quality (1)
Articles 1 - 5 of 5
Full-Text Articles in Architecture
Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 5: Water Quality, New England Division, United States Army Corps Of Engineers
Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 5: Water Quality, New England Division, United States Army Corps Of Engineers
Dickey-Lincoln School Lakes Project
This design memorandum presents the results of several studies undertaken to provide an understanding of present and potential future water quality conditions within and downstream from Dickey and Lincoln School Lakes in accordance with the requirements of ETL 1110-2-1402, dated 12 November 1976. Included are an examination of baseline water quality conditions and the findings of qualitative and quantitative predictive analyses performed to evaluate water quality conditions during all phases of the project's lifetime. This document will also serve as a reference for the water quality portions of the project Environmental Impact Statement.
Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division
Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division
Dickey-Lincoln School Lakes Project
This draft EIS address the impacts of the dams and appurtenant structures. The marketing and transmission of power from Federal projects are the statutory responsibility of the Department of the Interior. Accordingly, they are conducting transmission line studies in the preparation of a draft EIS. The draft EIS for transmission line and marketing is scheduled to be submitted to the Council on Environmental Quality in February 1978. Both drafts will be combined and submitted as a Final Environmental Impact Statement in August 1978.
Dickey-Lincoln School Lakes Project Environmental Impact Statement : Appendix G: Recreation Resources, Northern Maine Regional Planning Commission, Land Use Consultants, Inc., New England Division, U.S. Army Corps Of Engineers
Dickey-Lincoln School Lakes Project Environmental Impact Statement : Appendix G: Recreation Resources, Northern Maine Regional Planning Commission, Land Use Consultants, Inc., New England Division, U.S. Army Corps Of Engineers
Dickey-Lincoln School Lakes Project
This report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. The primary impact area of the proposed project (project area) includes the St. John River watershed upstream of the proposed damsites to the confluence of Nine-mile Brook. The area is bounded by the watershed divide with the Allagash River on the east and the Canadian Border on the west.
Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior
Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior
Dickey-Lincoln School Lakes Project
The purpose of this report is to investigate various transmission system alternatives and recommend a plan of service to integrate power from the Dickey-Lincoln School Lakes (D-L) Project into the New England electric power transmission system.
Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.
Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.
Dickey-Lincoln School Lakes Project
This study is to assess the effects or impacts of construction and operation of the Dickey-Lincoln hydroelectric project upon the people in the St. John Valley, Maine, and New England. Having determined the effects of the project, a second objective is to discuss mitigation of defined adverse impacts. More specifically, this study attempts to identify adverse impacts and deal with how to minimize such impacts if at all possible.