Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 3 of 3
Full-Text Articles in Architecture
Outsourcing Vdc Workflows, Kyle K. Bresnahan
Outsourcing Vdc Workflows, Kyle K. Bresnahan
Construction Management
In an increasingly demanding world for infrastructure, technological methods have been found to assist construction project's. As innovative construction methods are constantly increasing, so is the demand for technological needs within the architecture, engineering, and construction (AEC) industry. To ensure technological adoption, many countries have started to mandate higher levels of building information modeling (BIM) documentation beyond the 2D construction documents traditionally required throughout construction review and permitting. Some companies have capitalized on this change to the extent of making BIM their primary business. These companies focus solely on virtual design and construction (VDC) and determine whether clients lacking this …
A Case Study On The Ucsf Transplant Center Renovation: Mitigating Covid-19 Risks And Tracking Cost Impact, Alec Steven Woodyatt
A Case Study On The Ucsf Transplant Center Renovation: Mitigating Covid-19 Risks And Tracking Cost Impact, Alec Steven Woodyatt
Construction Management
At the beginning of 2020, the world was turned upside down at the hands of the global coronavirus pandemic. Today, economies and business are counting the costs and wondering what recovery will look like – how to navigate and adapt to a new style of life after returning from government-mandated lockdowns. The question on everyone’s minds is, “how do we continue to work while keeping people safe?” This question is extremely relevant in the construction industry where, for most people, working from home is not an option. This case study will delve into how Dome Construction, along with their client, …
Residential Bathroom And Tile Shower Addition During Covid-19 Quarantine, Joseph Szillinsky
Residential Bathroom And Tile Shower Addition During Covid-19 Quarantine, Joseph Szillinsky
Construction Management
This paper outlines the design and construction of a new code compliant bathroom including: a low profile shower pan, ceramic-tile shower enclosure, and new plumbing piping and fixtures. One of the main objectives was to complete the new shower which would be easily accessible and maintenance free in order to support a local elderly couple. The selection of this project took place during the COVID-19 pandemic approximately nine months after California issued the first mandatory statewide Stay-at-Home Order. During the early design and development stages an opportunity to collaborate with a local trades-person was identified as well as the need …