Open Access. Powered by Scholars. Published by Universities.®

Architecture Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Architecture

A Hermeneutic Phenomenological Study Into The Impact Of Bim On The Social Dynamics Of The Aec Professional In The Workplace., Malachy Mathews Dr. Mar 2021

A Hermeneutic Phenomenological Study Into The Impact Of Bim On The Social Dynamics Of The Aec Professional In The Workplace., Malachy Mathews Dr.

Doctoral

A review of the literature published surrounding new digital design and construction technologies and associated processes described within the Architecture, Engineering, and Construction (AEC) community as Building Information Modelling (BIM) or Virtual Design and Construction (VDC) reveals a gap in the theoretical understanding of the impact these technologies are having on professionals who work in this industry. The central aim of this research is to discover if there has been a shift in social dynamics as a result of the adoption of BIM in the workplace and, if there has been, to discuss the meaning of this for the industry …


Identification Of Key Performance Tasks To Demonstrate The Benefit Of Introducing The Facilities Manager At An Early Stage In The Building Information Modelling Process On Public Sector Projects In Ireland., Barry Mcauley Jan 2016

Identification Of Key Performance Tasks To Demonstrate The Benefit Of Introducing The Facilities Manager At An Early Stage In The Building Information Modelling Process On Public Sector Projects In Ireland., Barry Mcauley

Doctoral

Modelling (BIM) governed process was investigated in this thesis. Governments are now seeking a more rewarding methodology in the management and procurement of public sector building assets. This has seen an integrated focus by International Governments on BIM as a partial solution in both managing and procuring public sector building assets. Despite BIM bringing the Facility Manager closer to project conceptualisation, there was still a reluctance and a lack of perceived benefits of having them involved earlier in the design phase. There remains a lack of clear evidence on what improved contribution the Facilities Manager can provide. This thesis provides …