Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network

Open Access. Powered by Scholars. Published by Universities.®

Theses/Dissertations

Electronic Theses and Dissertations

Civil and Environmental Engineering

Bridges

South Dakota State University

Articles 1 - 1 of 1

Full-Text Articles in Entire DC Network

Rehabilitation Of Longitudinal Joints In Double-Tee Girder Bridges, Lucas Michael Bohn Jan 2017

Rehabilitation Of Longitudinal Joints In Double-Tee Girder Bridges, Lucas Michael Bohn

Electronic Theses and Dissertations

Prefabricated bridge elements have become an essential part of accelerated bridge construction (ABC), which is an emerging technology to expedite bridge construction. Among several bridge girder types, precast double-tee girders are common on county bridges in South Dakota because of the ease of construction, the reduced construction time, and the potentially lower overall cost. However, the longitudinal joints of these bridges are rapidly deteriorating with many needing replacement before the expected 75- year service life. Research was conducted at South Dakota State University (SDSU) to develop, construct, and evaluate the performance of rehabilitation methods on this type of bridge. Current …