Schedule

Articles 1 - 4 of 4

Full-Text Articles in Entire DC Network

Development Of A Conceptual Design, Estimate, & Schedule For Cal Poly Track & Field Hurdle Shed, Jonathan Chagnon Dec 2021

Development Of A Conceptual Design, Estimate, & Schedule For Cal Poly Track & Field Hurdle Shed, Jonathan Chagnon

Construction Management

This paper details the processes completed to produce the conceptual design, estimate, and schedule for a track and field hurdle shed at the Cal Poly Track facility. The main objective for this project was to create a conceptual idea for the track team that would make use of the current open space at the facility and create more storage space for current and future equipment obtained by the program. By completing this project, the track team would be able to receive a design that would allow them to push the concept forward as possible, an estimate that would give the …


Journeyman International: Third Lens Ministries Development In Jonestown, Mississippi, Josh Riley De Mattei Jun 2021

Journeyman International: Third Lens Ministries Development In Jonestown, Mississippi, Josh Riley De Mattei

Construction Management

Jonestown, Mississippi has been known to be a place of poverty and in need of infrastructure. A nonprofit, Third Lens Ministries is developing housing for the people of Jonestown, Mississippi. Over the last 9 months, an architect Margy Maher, an engineer Autumn Wagner, as well as myself, a construction management major, have all collaborated in order to design, engineer and plan the perfect Dwelling for the people of Jonestown, Mississippi. While the scope of the project includes community centers and housing, our team’s scope was to focus on the residential development and site work. As the construction manager, my deliverables …


Resequencing To Make Up Lost Time During The Covid-19 Pandemic: Case Study, Enzo Av Rienzi Jun 2021

Resequencing To Make Up Lost Time During The Covid-19 Pandemic: Case Study, Enzo Av Rienzi

Construction Management

Construction schedules are typically built by organizing activities according to trades as a whole. The entire foundation is poured, then the entire superstructure is erected, followed by interior framing, etc. However, for projects with an unchangeable finish date such as a school, other scheduling methods must be considered when the project is faced with uncontrollable, force majeure events which threaten to delay the project deadline. In order to examine the efficacy of alternative scheduling techniques, analysis of a $50 million school project will provide insight into how tasks can be safely overlapped to gain lost time in a schedule. This …


Schedule Efficiency Associated With The Tilt-Up Construction Method: A Case Study, Jake A. Barron Mar 2021

Schedule Efficiency Associated With The Tilt-Up Construction Method: A Case Study, Jake A. Barron

Construction Management

Tilt-up is an efficient method of project delivery that is best suited for large, flat projects such as commercial warehouses and distribution centers. The hypothesis is that this method of casting wall panels on site, and then tilting them upright, allows for certain unique activity sequences which could provide faster project completion. In order to prove this theory, analysis of two tilt-up projects completed within a mile of each other by the same contractor, and assessment of their schedules, will provide insight into the specific tasks that allow for better delivery speed. This methodology paired with interviews of team members, …