Analysis Of Military Construction Cost Growth In Usaf Major Defense Acquisition Programs, Emily E. Angell, Edward D. White, Jonathan D. Ritschel, Alfred E. Thal Jr. Apr 2020

Analysis Of Military Construction Cost Growth In Usaf Major Defense Acquisition Programs, Emily E. Angell, Edward D. White, Jonathan D. Ritschel, Alfred E. Thal Jr.

Faculty Publications

This study uses descriptive and inferential statistics to identify cost growth Analysis of Military Construction of military construction (MILCON) at the programmatic level, while bridging the gap between Selected Acquisition Report (SAR) estimates and actual project costs. Findings of this study aid the cost community with appropriate allocation of resources in developing these estimates. Overall, Major Defense Acquisition Programs (MDAP) appear to experience more negative growth (cost savings) in MILCON estimates on reviewed SARs— typically less than 0.2% of the total program cost. SAR estimates became more accurate from the first to last SAR in comparison to the total MILCON …


A Case For Open Mission Systems In Dod Aircraft Avionics, Michael J. Brown, R. David Fass, Jonathan D. Ritschel Jan 2019

A Case For Open Mission Systems In Dod Aircraft Avionics, Michael J. Brown, R. David Fass, Jonathan D. Ritschel

Faculty Publications

The DOD is adopting open mission systems (OMS) as the future in the military aviation environment. OMS proponents promise reduced costs and truncated schedules through increased competition in the marketplace and reduced coding efforts. To the best of our knowledge, no studies have examined the success of these open architectures in the DOD. Therefore, we investigate costs and schedule for a recent DOD avionics OMS demonstration platform in comparison to 13 historically analogous programs.


Likelihood And Cost Impact Of Engineering Change Requirements For Dod Contracts, James C. Ellis, Edward D. White, Jonathan D. Ritschel, Shawn M. Valentine, Brandon Lucas, Ian S. Cordell Apr 2018

Likelihood And Cost Impact Of Engineering Change Requirements For Dod Contracts, James C. Ellis, Edward D. White, Jonathan D. Ritschel, Shawn M. Valentine, Brandon Lucas, Ian S. Cordell

Faculty Publications

Purpose: There appears to be no empirical-based method in the literature for estimating if an engineering change proposal (ECP) will occur or the dollar amount incurred. This paper aims to present an empirically based approach to address this shortfall.
Design/Methodology/Approach: Using the cost assessment data enterprise database, 533 contracts were randomly selected via a stratified sampling plan to build two regression models: one to predict the likelihood of a contract experiencing an ECP and the other to determine the expected median per cent increase in baseline contract cost if an ECP was likely. Both models adopted a stepwise approach. A …


The Myth Of Strategic And Tactical Airlift, Jacob D. Maywald, Adam D. Reiman, Alan A. Johnson, Robert E. Overstreet Apr 2017

The Myth Of Strategic And Tactical Airlift, Jacob D. Maywald, Adam D. Reiman, Alan A. Johnson, Robert E. Overstreet

Faculty Publications

In the 21st century, our ability to quickly and decisively deliver combat forces and equipment is of the utmost importance in achieving our national security objectives. The swiftness and flexibility of the US Air Force’s mobility airlift fleet is the key to executing a rapid global mobility strategy. The operational effectiveness and efficiency of military air transportation relies on the expertise and intuition of Air Mobility Command’s (AMC) mobility planners. Working in coordination with the United States Transportation Command (USTRANSCOM) and geographic combatant commands (GCC), AMC is responsible for the tasking and tracking of almost 900 daily mobility sorties worldwide. …