Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Macrobenthos Responses To Dam Removal And Habitat Restoration In The West River, Connecticut, Robert W. Sheridan May 2019

Macrobenthos Responses To Dam Removal And Habitat Restoration In The West River, Connecticut, Robert W. Sheridan

Master's Theses

Dam removal is being increasingly used nationwide to restore impaired rivers and streams. While dam removals are becoming more prevalent, little is known about whether these efforts create conditions for the enhancement and or establishment of desired biota.

Ongoing monitoring of these projects is an important step in the restoration process to ensure project goals are being met and the restoration has been successful.

This thesis focuses on the Pond Lily Dam removal and restoration which took place in October 2015 along the West River in New Haven Connecticut that removed an aging mill dam with the objective of restoring …


Evaluation Of Wind And Solar Energy Investments In Texas, Byungik Chang, Ken Starcher Mar 2019

Evaluation Of Wind And Solar Energy Investments In Texas, Byungik Chang, Ken Starcher

Civil Engineering Faculty Publications

The primary objective of the project is to evaluate the benefits of wind and solar energy and determine economical investment sites for wind and solar energy in Texas with economic parameters including payback periods. A 50 kW wind turbine system and a 42 kW PV system were used to collect field data. Data analysis enabled yearly energy production and payback period of the two systems.

The average payback period of a solar PV system was found to be within a range of 2-20 years because the large range of the payback period for PV systems were heavily influenced by incentives. …