Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Portland State University

Environmental Engineering

Estuaries

Publication Year

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Mixing Layer Dynamics In Separated Flow Over An Estuarine Sill With Variable Stratification, Stefan A. Talke, Alexander R. Horner-Devine, C. Chris Chickadel Sep 2010

Mixing Layer Dynamics In Separated Flow Over An Estuarine Sill With Variable Stratification, Stefan A. Talke, Alexander R. Horner-Devine, C. Chris Chickadel

Civil and Environmental Engineering Faculty Publications and Presentations

We investigate the generation of a mixing layer in the separated flow behind an estuarine sill (height H ∼ 4 m) in the Snohomish River, Washington as part of a larger investigation of coherent structures using remote and in situ sensing. During increasing ebb flows the depth d and stratification decrease and a region of sheared flow characterized by elevated production of turbulent kinetic energy develops. Profiles of velocity and acoustic backscatter exhibit coherent fluctuations of order 0.1 Hz and are used to define the boundaries of the mixing layer. Variations in the mixing layer width and its embedded coherent …


Hydrodynamics And Morphology In The Ems/Dollard Estuary: Review Of Models, Measurements, Scientific Literature, And The Effects Of Changing Conditions, Stefan A. Talke, Huib E. De Swart Jan 2006

Hydrodynamics And Morphology In The Ems/Dollard Estuary: Review Of Models, Measurements, Scientific Literature, And The Effects Of Changing Conditions, Stefan A. Talke, Huib E. De Swart

Civil and Environmental Engineering Faculty Publications and Presentations

The Ems estuary has constantly changed over the past centuries both from man-made and natural influences. On the time scale of thousands of years, sea level rise has created the estuary and dynamically changed its boundaries. More recently, storm surges created the Dollard sub-basin in the 14th -15th centuries. Beginning in the 16th century, diking and reclamation of land has greatly altered the surface area of the Ems estuary, particularly in the Dollard. These natural and anthropogenic changes to the surface area of the Ems altered the flow patterns of water, the tidal characteristics, and the patterns of sediment deposition …