Open Access. Powered by Scholars. Published by Universities.®
- Discipline
-
- Business Administration, Management, and Operations (16)
- Electrical and Computer Engineering (16)
- Engineering (16)
- Power and Energy (16)
- Physical Sciences and Mathematics (15)
-
- Social and Behavioral Sciences (14)
- Statistics and Probability (14)
- Architecture (13)
- Arts and Humanities (11)
- History (11)
- Environmental Sciences (10)
- Geography (10)
- Cultural Resource Management and Policy Analysis (9)
- Operations Research, Systems Engineering and Industrial Engineering (8)
- Public Affairs, Public Policy and Public Administration (8)
- Life Sciences (7)
- Recreation, Parks and Tourism Administration (7)
- Construction Engineering (6)
- Environmental Indicators and Impact Assessment (6)
- Law (6)
- Oceanography and Atmospheric Sciences and Meteorology (6)
- Animal Sciences (5)
- Aquaculture and Fisheries (5)
- Climate (5)
- Environmental Law (5)
- Natural Resources Management and Policy (5)
- Education (4)
- Fresh Water Studies (4)
- Physical and Environmental Geography (4)
- Keyword
-
- Hydroelectric power plants (12)
- Maine (11)
- Environmental impact statements (7)
- Energy policy (6)
- Dams (5)
-
- Water resources development (5)
- Saint John River Valley (Me. and Québec) (4)
- Saint John River Valley (Me. and Quebec) (3)
- Dickey-Lincoln School Lakes Project (2)
- Electric lines (2)
- Saint John River Watershed (Me.) (2)
- Allagash River Watershed (1)
- Aroostook (1)
- Aroostook County (1)
- Aroostook County (Me.) (1)
- Electric power transmission (1)
- Financial feasibility study for electric power (1)
- Fishery management (1)
- Forests and forestry (1)
- Labor supply (1)
- New England Chapter (1)
- Power resources (1)
- Saint John River (1)
- Sierra Club (1)
- Technology (1)
- Wildlife management (1)
Articles 1 - 18 of 18
Full-Text Articles in Business
Dickey-Lincoln School Lakes Project Economic Analysis Study, New England Division, United States Army Engineer Division, Acres American Incorporated
Dickey-Lincoln School Lakes Project Economic Analysis Study, New England Division, United States Army Engineer Division, Acres American Incorporated
Dickey-Lincoln School Lakes Project
The purpose of this study was to perform an economic assessment of the Dickey-Lincoln School Lakes Project. This was accomplished by simulating the New England electrical supply system with and without the project and making a comparison of the resultant production costs.
Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix K: Fish & Wildlife Mitigation Plan & Impacts (Revised), New England Division, United States Army Engineer Division
Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix K: Fish & Wildlife Mitigation Plan & Impacts (Revised), New England Division, United States Army Engineer Division
Dickey-Lincoln School Lakes Project
The proposed plan is comprised of three major segments: terrestrial, fisheries and endangered species. Each segment is essentially a self-contained unit. All costs for the three segments including land acquisition, operation and maintenance and capital equipment, are to be charged to the project and allocated to the project purposes of hydroelectric generation and flood control.
Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix C: Social & Economic Assessment (Supplement 1), Pamela D. Savetsky, New England Division, United States Army Engineer Division
Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix C: Social & Economic Assessment (Supplement 1), Pamela D. Savetsky, New England Division, United States Army Engineer Division
Dickey-Lincoln School Lakes Project
A review of available literature on rural communities which have been affected by construction projects of a similar scale has been completed. This review will aid in the development of a scenario of the construction labor peak and decline effects on the Dickey-Lincoln area.
An Overview Of The Proposed Dickey-Lincoln School Lakes Hydro-Electric Project : Aroostook County, Maine, New England Division, Department Of The Army, Corps. Of Engineers, Department Of Energy
An Overview Of The Proposed Dickey-Lincoln School Lakes Hydro-Electric Project : Aroostook County, Maine, New England Division, Department Of The Army, Corps. Of Engineers, Department Of Energy
Dickey-Lincoln School Lakes Project
An overview of The Dickey-Lincoln Project in northern Aroostook County, Maine is a proposed Federally financed hydro-electric power generating facility. Electric energy generated by the facility would be introduced into the New England Power Pool system through construction of new transmission lines across northern Maine, New Hampshire, and Vermont.
Responsibility for investigation and construction rests in the two Federal agencies, i.e. dams and reservoirs in the U.S. Army Corps of Engineers and transmission lines in the U.S. Department of Energy (DOE). The two actions are part of the same proposal, although they are in essence separate and distinct. The dams …
Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Corps Of Engineers
Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Corps Of Engineers
Dickey-Lincoln School Lakes Project
The revised draft combines data previously published in two separate impact statements prepared by the Corps relating to the dams, reservoirs and Power Plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid.
Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix C: Social And Economic Assessment, Edward C. Jordan, Roger Creighton
Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix C: Social And Economic Assessment, Edward C. Jordan, Roger Creighton
Dickey-Lincoln School Lakes Project
The purpose of this assessment of the social and economic impact of implementing the Dickey-Lincoln School Lakes Project, therefore, is not to flatly predict impacts. Rather, the intent is to provide information and judgments which can help people recognize the potential for changes and take appropriate steps to prepare for, accommodate, and adjust to those changes. Thus we hope that this report's success will be measured by how well it provides information with which local citizens and all others involved in this project can proceed with their planning and decision-making processes.
Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.
Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.
Dickey-Lincoln School Lakes Project
The Dickey-Lincoln Hydroelectric Dam is a water resources project proposed by the Federal Government (U. S. Army Corps of Engineers). Therefore, in accordance with the National Environmental Policy Act, the Corps of Engineers is required to prepare an environmental impact statement (EIS) on the project. A federal plan or project such as Dickey-Lincoln should take into account its effect upon man's health, safety, welfare and economic well-being, as well as effects upon the surrounding environment. More importantly, project plans should be evaluated in a "manner calculated to encourage harmony between man and his environment." In other words, project plans or …
Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division
Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division
Dickey-Lincoln School Lakes Project
Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...
Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior
Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior
Dickey-Lincoln School Lakes Project
Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …
Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.
Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.
Dickey-Lincoln School Lakes Project
This study is to assess the effects or impacts of construction and operation of the Dickey-Lincoln hydroelectric project upon the people in the St. John Valley, Maine, and New England. Having determined the effects of the project, a second objective is to discuss mitigation of defined adverse impacts. More specifically, this study attempts to identify adverse impacts and deal with how to minimize such impacts if at all possible.
Dickey-Lincoln School Project : Financial Feasibility Study For Electric Power, Southeastern Power Administration, United States Department Of The Interior
Dickey-Lincoln School Project : Financial Feasibility Study For Electric Power, Southeastern Power Administration, United States Department Of The Interior
Dickey-Lincoln School Lakes Project
Analysis of the power feature of the proposed Dickey-Lincoln School Project finds that sufficient power revenues can be obtained from the sale of power under marketing arrangements consistent with Section 5 of the Flood Control Act of 1944 to repay all costs associated with the production and distribution of the power produced.
An Energy Strategy For New England : Objectives And Implementation, Development Sciences, Inc., New England Regional Commission
An Energy Strategy For New England : Objectives And Implementation, Development Sciences, Inc., New England Regional Commission
Dickey-Lincoln School Lakes Project
This report is a product of the New England Regional Commission's Energy Research and Policy Formulation Program. The goal of the Energy Program is to supply the members of the New England Regional Commission, which is comprised of the six New England Governors and a Federal Co-chairman appointed by the President, with reliable baseline information on New England's energy requirements and vulnerability, and to provide the Governors and the region with viable energy policy options and recommendations to guide New England's energy future.
Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers
Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers
Dickey-Lincoln School Lakes Project
The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natural energy of the upper St. John River in northern Maine for use as a source of electricity to meet future needs of New England consumers.
Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior
Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior
Dickey-Lincoln School Lakes Project
This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …
The Benefits And Costs Of The Dickey-Lincoln Project : A Preliminary Report, A. Myrick Freeman
The Benefits And Costs Of The Dickey-Lincoln Project : A Preliminary Report, A. Myrick Freeman
Dickey-Lincoln School Lakes Project
The Dickey-Lincoln School Hydro Power Project was authorized by Congress in 1965. Advanced engineering and design work was then begun by the Army Corps of Engineering in early 1966. Further detailed design work was suspended in November, 1967 because .of Congress' failure to appropriate further funds for design or construction. However, it now appears likely that Congress will include funds for continued design and engineering work in its appropriations for fiscal year 1974-75.
A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter
A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter
Dickey-Lincoln School Lakes Project
This report was under-taken primarily to evaluate the impact that the construction of the Dickey-Lincoln project would have upon the resources of the Upper St. John River, and to examine the assertion that the Dickey-Lincoln project constitutes a wise use of the public's environmental and economic resources. Since the case that has been made for the construction of the Dickey-Lincoln project rest primarily on the justification of the project in economic terms, this aspect of the project proposal will be intensively explored.
Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray
Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray
Dickey-Lincoln School Lakes Project
The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical sup-plement will be of particular interest to …
Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray
Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray
Dickey-Lincoln School Lakes Project
The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical sup-plement will be of particular interest to …