Open Access. Powered by Scholars. Published by Universities.®

Business Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 5 of 5

Full-Text Articles in Business

Methods To Support The Project Selection Problem With Non-Linear Portfolio Objectives, Time Sensitive Objectives, Time Sensitive Resource Constraints, And Modeling Inadequacies, Neil C. Ranly Sep 2018

Methods To Support The Project Selection Problem With Non-Linear Portfolio Objectives, Time Sensitive Objectives, Time Sensitive Resource Constraints, And Modeling Inadequacies, Neil C. Ranly

Theses and Dissertations

The United States Air Force relies upon information production activities to gain insight regarding uncertainties affecting important system configuration and in-mission task execution decisions. Constrained resources that prevent the fulfillment of every information production request, multiple information requestors holding different temporal-sensitive objectives, non-constant marginal value preferences, and information-product aging factors that affect the value-of-information complicate the management of these activities. This dissertation reviews project selection research related to these issues and presents novel methods to address these complications. Quantitative experimentation results demonstrate these methods’ significance.


An Optimization Model For Operating Room Scheduling To Reduce Blocking Across The Perioperative Process, Amin Abedini, Wei Li, Honghan Ye Jul 2017

An Optimization Model For Operating Room Scheduling To Reduce Blocking Across The Perioperative Process, Amin Abedini, Wei Li, Honghan Ye

Mechanical Engineering Faculty Publications

Operating room (OR) scheduling is important. Because of increasing demand for surgical services, hospitals must provide high quality care more efficiently with limited resources. When constructing the OR schedule, it is necessary to consider the availability of downstream resources, such as intensive care unit (ICU) and post anaesthesia care unit (PACU). The unavailability of downstream resources causes blockings between every two consecutive stages. In this paper we address the master surgical schedule (MSS) problem in order to minimize blockings between two consecutive stages. First, we present a blocking minimization (BM) model for the MSS by using integer programming, based on …


Scheduling Strategies For Construction Project Managers Toward On Time Delivery, Paul Shamp Jan 2017

Scheduling Strategies For Construction Project Managers Toward On Time Delivery, Paul Shamp

Walden Dissertations and Doctoral Studies

Construction management projects involve complex, dynamic environments resulting in uncertainty and risk, compounded by demanding time constraints. Research indicated project managers have struggled to identify best practices for scheduling construction projects via critical path methodologies while searching for tools to increase timely job completions and budget profits. The purpose of this single case study was to explore the strategies that construction project managers used to manage scheduled construction project delivery on time. The constructivist philosophical worldview was used as the framework for this study. Data were collected from semistructured interviews from 7 project managers from 5 different construction companies selected …


Vehicle Minimization For The Multimodal Pickup And Delivery Problem With Time Windows, Benjamin A . Clapp Mar 2013

Vehicle Minimization For The Multimodal Pickup And Delivery Problem With Time Windows, Benjamin A . Clapp

Theses and Dissertations

The algorithm proposed here is used for heuristic solutions for the Multimodal Multiple Vehicle Routing Problem with Unloading Capacity, Pickup and Dropoff, and Time Windows, solved so as to minimize the number of vehicles used, subject to varying objective function values for each vehicle. The MVRP is simplified and split into a routing problem and a scheduling problem. The routing problem is addressed by Dijkstra's Algorithm. This generates a new network for the second stage of the algorithm. It is assumed that the shortest path is the correct path to use, and shipments each travel unimodally. The scheduling problem is …


Optimization Model For Base-Level Delivery Routes And Crew Scheduling, Young-Ho Cha Mar 2005

Optimization Model For Base-Level Delivery Routes And Crew Scheduling, Young-Ho Cha

Theses and Dissertations

In the U.S. Air Force, a Logistic Readiness Squadron (LRS) provides material management, distribution, and oversight of contingency operations. Dispatchers in the LRS must quickly prepare schedules that meet the needs of their customers while dealing with real-world constraints, such as time windows, delivery priorities, and intermittent recurring missions. Currently, LRS vehicle operation elements are faced with a shortage of manpower and lack an efficient scheduling algorithm and tool. The purpose of this research is to enhance the dispatchers' capability to handle flexible situations and produce "good" schedules within current manpower restrictions. In this research, a new scheduling model and …