Open Access. Powered by Scholars. Published by Universities.®

Business Commons

Open Access. Powered by Scholars. Published by Universities.®

Finance and Financial Management

Air Force Institute of Technology

Life cycle costing

Publication Year

Articles 1 - 4 of 4

Full-Text Articles in Business

The Costs Of Not Using Green Design In The Usaf: Would Using Green Building Design Have Resulted In Life Cycle Cost Savings?, John Kimball Osborne Mar 2007

The Costs Of Not Using Green Design In The Usaf: Would Using Green Building Design Have Resulted In Life Cycle Cost Savings?, John Kimball Osborne

Theses and Dissertations

This study’s purpose is to determine if using green building design would have resulted in life cycle costs savings for the United States Air Force. Green designs are those that employ steps to mitigate the impacts facilities have on the environment by using resources more efficiently than conventional design. The prevailing ranking system for green design in the United States is the Leadership in Energy and Environmental Design (LEED) rating system which evaluates facilities on certain characteristics, assigning point values that translate to non-certified, certified, silver, gold, or platinum ratings. The author attempts here to show how previous studies indicated …


Cost As An Independent Variable: A Study Of Its Continued Use By Aeronautical Systems Center's Programs And Their Contractors To Set And Maintain Cost Objectives, Kevin W. Codrington Mar 2006

Cost As An Independent Variable: A Study Of Its Continued Use By Aeronautical Systems Center's Programs And Their Contractors To Set And Maintain Cost Objectives, Kevin W. Codrington

Theses and Dissertations

The purpose of this research was to assess whether Aeronautical System Center's (ASC's) acquisition professionals believe CAIV has enabled their programs and contractors to set and maintain cost objectives. The three major objectives of this thesis are to answer the following questions: First, Do ASC's acquisition professionals believe their programs are setting and maintaining cost objectives? Second, Do ASC's acquisition professionals believe their contractors are setting and maintaining cost objectives? Last, what is the practitioners' perspective of CAIV? This research identified CAIV as being well received by DoD. It also identified that ASC's acquisition professionals believe their programs and contractors …


Analysis And Forecasting Of U.S. Navy Operating And Support (O&S) Costs For Rotary Aircraft, Christopher J. Wilkes Mar 2004

Analysis And Forecasting Of U.S. Navy Operating And Support (O&S) Costs For Rotary Aircraft, Christopher J. Wilkes

Theses and Dissertations

This research explores forecasting techniques to estimate the Cost per Flying Hour (CPFH) for Navy rotary aircraft. Three separate forecasting techniques were evaluated to better predict the CPFH for better estimating and budgeting by the U.S. Navy. The process begins by empirically analyzing Operating & Support cost categories for each helicopter. Trends were examined in CPFH. For forecasting purposes, actual CPFH figures were compiled from 1997 to 2003 for the CH-46D, the CH-53D, the MH-53E, the SH-60F, the UH-1N, and the UH-3H helicopters. The forecasting techniques explored were the 3-year moving average, the single exponential smoothing method, and Holt's linear …


A Life Cycle Cost Analysis Of The Proposed Replacement Of Pope Air Force Base's C-130e Fleet Using A Fleet Replacement Model, Lance R. French Mar 2002

A Life Cycle Cost Analysis Of The Proposed Replacement Of Pope Air Force Base's C-130e Fleet Using A Fleet Replacement Model, Lance R. French

Theses and Dissertations

The 43rd Airlift Wing at Pope AFB, NC, possesses 33 E-model C-130 aircraft. The airplanes range in age from 30-36 years old. Current plans call for replacing Pope's aging fleet of tactical airlifters with new C-130J model planes in FY11. There are two replacement alternatives proposed in this research. The first is to calls for replacing the C-130Es with C-130Js now. The second option is upgrade the C-130Es to C-130Xs and replace them in 10 years with the C-130J. The results indicate that the least cost solution is to upgrade Pope's fleet of C-130Es to C-130Xs now. However, after conducting …