Open Access. Powered by Scholars. Published by Universities.®

Business Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 8 of 8

Full-Text Articles in Business

Culvert Material Cost Comparison, New England Environmental Finance Center Nov 2010

Culvert Material Cost Comparison, New England Environmental Finance Center

Economics and Finance

The following tables provide a detailed look at the role that culvert material and culvert diameter play in the overall cost of a culvert replacement project. Table 1 displays the cost per foot purchase price arranged by diameter size for the various culvert materials that are currently available. Table 2 displays the average additional culvert pipe material cost (increased cost to upsize minus original in-kind replacement cost) that would be incurred when upsizing a given diameter of culvert with a 50 foot length by factors of: 200%, 250% and 300%.


Unlv Magazine, Tony Allen, Shane Bevell, Donna Mcaleer, Ched Whitney, Cate Weeks Oct 2010

Unlv Magazine, Tony Allen, Shane Bevell, Donna Mcaleer, Ched Whitney, Cate Weeks

UNLV Magazine

No abstract provided.


Construction Cost Models, Barry Dikeman Aug 2010

Construction Cost Models, Barry Dikeman

Economics and Finance

The following are a series of cost estimate models similar in format to a typical engineer’s estimate that were developed in support of our financial impact assessment report for LD 1725. The models us current material costs, labor costs, and equipment costs for the region to provide a comparative cost analysis of seven culvert replacement scenarios. The models provide information about what the cost impact of LD 1725 would be for typical culvert replacements in Maine. However, due to the inherent restrictions of the cost modeling framework we were not able to include the abundance of variables that would be …


Campaspe And Murray Shires Infrastructure Gap Analysis Report, Nadine E. White, Jeremy Buultjens, Rose Wright, Meredith Lawrence Jul 2010

Campaspe And Murray Shires Infrastructure Gap Analysis Report, Nadine E. White, Jeremy Buultjens, Rose Wright, Meredith Lawrence

Nadine E White

No abstract provided.


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending June 10, 2010, Margaret N. Rees Jun 2010

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending June 10, 2010, Margaret N. Rees

Walking Box Ranch

  • UNLV has purchased weather equipment, established a weather station at the ranch, and has begun collecting weather data and conducting preliminary research. The station collects hourly data on temperature, humidity, wind speed and direction, and insolation that is transmitted wirelessly to UNLV and captured and projected on the PLI WBR website. A database of weather information will be maintained for further analysis. Research quantifying solar insolation at the ranch will be conducted.
  • UNLV has begun preparing informational brochures that will be available to the public at the ranch in the future and will provide information on biology, geology, anthropology, and …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending April 10, 2010, Margaret N. Rees Apr 2010

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending April 10, 2010, Margaret N. Rees

Walking Box Ranch

  • UNLV and Dornbusch and Associates have signed a contract for Dornbusch to conduct a “Visitor Services Feasibility, Compatibility, Market Study, and Business Plan” at the ranch, including all future museum and research center activities. This effort is kicking off in April 2010.
  • UNLV is in the process of purchasing and installing a weather station at the ranch, and will conduct preliminary research using this equipment. Funding for a dual axis solar tracker was obtained from the UNLV sustainability initiative.
  • Bill Wood, UNLV Real Estate Management, is continuing to work with Rex Bell to create an inventory of items that Rex …


Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2010, Margaret N. Rees Jan 2010

Walking Box Ranch Planning And Design Quarterly Progress Report: Period Ending January 10, 2010, Margaret N. Rees

Walking Box Ranch

  • To advance educational and research goals at the ranch UNLV will fund the purchase and installation of a weather station at the ranch, and preliminary research using this equipment. PI Dr. Suresh Sardineni, Mechanical Engineering, will assess the renewable energy resources at the ranch and find methods to integrate them into existing and proposed new buildings at the site. The planned facilities will monitor beam and global solar radiation, wind speed and direction, temperature, and realative humidity. UNLV will provide funding to support two graduate students and partial salary for Dr. Sardineni.
  • Bill Wood, UNLV Real Estate Management, is working …


Alternative "More Efficient" Irrigation Systems, David A. Bainbridge Jan 2010

Alternative "More Efficient" Irrigation Systems, David A. Bainbridge

David A Bainbridge

Many traditional irrigation systems work well for ecological restoration projects. These demand responsive systems are very water efficient and robust and have proved themselves in the most extreme desert conditions.