Open Access. Powered by Scholars. Published by Universities.®
- Discipline
-
- Arts and Humanities (7)
- Construction Engineering (7)
- Geography (7)
- Social and Behavioral Sciences (7)
- Engineering (6)
-
- History (6)
- Electrical and Computer Engineering (5)
- Physical Sciences and Mathematics (5)
- Power and Energy (5)
- Public Affairs, Public Policy and Public Administration (5)
- Statistics and Probability (5)
- Environmental Sciences (4)
- Operations Research, Systems Engineering and Industrial Engineering (4)
- Recreation, Parks and Tourism Administration (4)
- Environmental Indicators and Impact Assessment (3)
- Life Sciences (3)
- Architectural Engineering (2)
- Ecology and Evolutionary Biology (2)
- Forest Sciences (2)
- Other Operations Research, Systems Engineering and Industrial Engineering (2)
- Physical and Environmental Geography (2)
- Terrestrial and Aquatic Ecology (2)
- Agricultural and Resource Economics (1)
- Animal Sciences (1)
- Aquaculture and Fisheries (1)
- Art Practice (1)
- Art and Design (1)
- Climate (1)
- Keyword
-
- Electric lines (4)
- Electric power transmission (4)
- Environmental impact statements (4)
- New England (4)
- Maps (3)
-
- Aerial photogrammetry (1)
- Aroostook County (1)
- Dickey-Lincoln Hydro-Electric Project (1)
- Earth sciences (1)
- Geological surveys (1)
- Geology (1)
- History (1)
- Hydroelectric power plants (1)
- Labyrinths (1)
- Land art (1)
- Liminality (1)
- Meditation (1)
- Sacred art (1)
- Sacred space (1)
- Saint John River (Me. and N.B.) (1)
- Saint John River Watershed (Me. and N.B.) (1)
- Structural (1)
- Water resources development (1)
- Publication
- Publication Type
Articles 1 - 9 of 9
Full-Text Articles in Landscape Architecture
The Sacred Art Of Labyrinth Design: Optimization Of A Liminal Aesthetic, Yadina Z. Clark
The Sacred Art Of Labyrinth Design: Optimization Of A Liminal Aesthetic, Yadina Z. Clark
Electronic Theses and Dissertations
This paper provides an overview of both practical and esoteric elements that inform the labyrinth design process and touches on the physiological and psychological effects of meditative walking. In addition to new installations, some other outcomes that have resulted from this research include an interactive online map of over 200 labyrinths in New England and two simple formulas for accurately calculating the path length of both 3- and 7-circuit Classical labyrinths.
Labyrinths, in their true, non-maze forms, have existed for thousands of years in numerous places around the world and there are similarities in the designs and uses of these …
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix G: Land Use Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy
Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix G: Land Use Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy
Dickey-Lincoln School Lakes Project
This report is in partial fulfillment of the requirement of the National Environmental Policy Act of 1969. It is a study of the existing and proposed land use impacts which would likely occur as a result of construction of the Dickey-Lincoln Transmission Line in con-junction with the Dickey-Lincoln Hydroelectric Project at Lincoln School in Northern Maine. This report is organized and follows basically a topical summary as outlined in the National Environmental Policy Act.
Ecological Resources Impact Study. Map Volume, United States. Department Of Energy
Ecological Resources Impact Study. Map Volume, United States. Department Of Energy
Dickey-Lincoln School Lakes Project
Environmental Assessment of Alternative Routes, Ecological Resources Impact Study, Maps and Legend land cover types
Land Use Impact Study. Map Volume, United States. Department Of Energy
Land Use Impact Study. Map Volume, United States. Department Of Energy
Dickey-Lincoln School Lakes Project
Environmental Assessment of Alternative Routes, Land Use Study, Maps, Existing land use
Dickey-Lincoln School Lakes Transmission Project : Draft Environmental Impact Statement, Transmission Eis Study Team, United States. Department Of Energy
Dickey-Lincoln School Lakes Transmission Project : Draft Environmental Impact Statement, Transmission Eis Study Team, United States. Department Of Energy
Dickey-Lincoln School Lakes Project
This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System.
Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy
Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy
Dickey-Lincoln School Lakes Project
Environmental Assessment of Alternative Routes, Visual/Recreational Resources Impact Studies, Maps of Recreational Resources
Use Of Remote Sensing To Quantify Construction Material And To Define Geologic Lineations : Dickey-Lincoln School Lakes Project, Maine, H. L. Mckim, C. J. Merry
Use Of Remote Sensing To Quantify Construction Material And To Define Geologic Lineations : Dickey-Lincoln School Lakes Project, Maine, H. L. Mckim, C. J. Merry
Dickey-Lincoln School Lakes Project
This report contains Appendixes A and B of Special Report 242, use of remote sensing to quantify construction material and to define geologic lineations.
Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers
Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers
Dickey-Lincoln School Lakes Project
Revised draft combines data previously published in two separate impact statements prepared by the corps relating to the dams, reservoirs and power plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid. The latter agency is responsible for the marketing and distribution of power generated at federally-financed installations.
Historic Houses And Museums In Maine Open For The 1974 Summer Season, Maine Historical Society
Historic Houses And Museums In Maine Open For The 1974 Summer Season, Maine Historical Society
Maine History
This article contains a detailed listing of historic houses and museums in Maine open for the 1974 summer season